3.2
Connecting Cables to the UPS5000-S-200K-FM
1. Ensure the maintenance bypass switch is OFF.
Open the front door, remove the front cover,
and remove covers from the top of the
cabinet based on the site requirements.
3. Connect the ground cable, input cables
(There is no need to connect the bypass
input power cable if the mains input and
bypass input share a power source.), and
signal cable.
Port
Bolt
Description
Specifications
M10 x 40
Mains input
M10 x 40
Bypass input
Battery
M12 x 60
input
M10 x 40
Output
M10 x 30
PE
2. (Skip this step if the mains input and bypass
input share a power source.) Remove the
copper bars between the mains input and
bypass input.
Torque
26N•m
26N•m
46N•m
26N•m
26N•m
4
signal
cable