4.5
CONTROLS
All controls for the machine are
provided by the customer. Each
installation should have provi-
sions to lock out tag out the
master panel for maintenance.
Review your installation carefully
to familiarize yourself with the
function and movement of each
control before starting.
1. Electrical Switches:
It is recommended that the
electrical controls be set up
to include a master panel
with the capabilities of lock
out tag out for service/
maintenance and an on/off
switch.
Review your installation
details before starting.
Fig. 4-2 CONTROLS (TYPICAL)
Master Panel
On/Off