Onboarding - Bosch vivatmo pro Instructions For Use Manual

Hide thumbs Also See for vivatmo pro:
Table of Contents

Advertisement

Installation
Administrators can additionally:
en
Change QC settings, see "6.2 Quality control (QC)".
Change language, see "2.1 Setting the language" in Administration instructions.
en
Change time and date, see "2.2 Setting date and time" in Administration instructions.
Activate/de-activate auto-lock, see "2.3 Setting Auto-Lock" in Administration instructions.
en
Install printers and export locations, see "4 Printer configuration" and "5.4 Export and Backup file configuration" in
Administration instructions.
Change Vivatmo pro handheld used with the basestation, see "5.1.2 Release the handheld" in Administration instructions.
en
Configure network, see "5.2 Network configuration" in Administration instructions.
Configure HL7 or GDT interfaces, see "5.3 Order/result interface" in Administration instructions.
en
Manage user accounts, see "6 User administration" in Administration instructions.
en

3.2.2 Onboarding

en
en
WARNING
en
1. Connect the jackplug from the power supply unit into the power adapter port on the rear of the Vivatmo pro basestation.
en
2. Plug the suitable adapter for your country firmly on the power supply unit.
3. Plug the main plug into a suitable socket. The Vivatmo pro basestation starts automatically.
en
en
18
Only use the Vivatmo pro basestation with the provided low voltage power supply unit. Attempted use
with other power sources may cause irreparable damage and invalidate the warranty.
Avoid to connect the Vivatmo pro basestation to a multiple socket-outlet to prevent interferences by
other devices.
© Bosch Healthcare Solutions GmbH
Instructions for use

Advertisement

Table of Contents
loading

Table of Contents