Prepare Discharge Chute Opening - Ferris SNAPPER PRO FAST-Vac Operator's Manual

Table of Contents

Advertisement

Installation

Prepare Discharge Chute Opening

Remove the Discharge Chute & Deck Guard
1. Remove the discharge chute (A, Figure 4), chute
mount rod (B) and mounting hardware.
NOTE: Retain the discharge chute, chute mount rod,
and mounting hardware. If the blower is removed from
the unit they need to be reinstalled for safe operation.
2. Remove the chute lock bolt (C) and nut.
3. Remove the deck guard (D). Save the bolts and
washers, as they will be required in a later step.
Remove the Deflector Plate
1. Loosen and remove the hardware (E, Figure 4)
that secures the deflector plate (F) to the mower
deck (G).
2. Remove the deflector plate.
3. Save the plate and hardware. When operating the
unit without the collection system installed, the
user will experience a better cutting quality if the
deflector plate in reinstalled.
Drill Hole in Discharge Chute Bracket
1. Examine the discharge chute mount bracket
on the mower deck (see Figure 5). If the hole
pattern looks like the one shown, you must drill a
3/8" hole in the location specified in Figure 5.
10
G
B
A
Figure 4. Remove Chute & Guard
A. Discharge Chute
B. Chute Mount Rod
C. Chute Lock Bolt
D. Guard
E. Deflector Plate Mount Hardware
F. Deflector Plate
G. Mower Deck
H. Discharge Chute Rod Mount Hardware
(3,8 cm)
5/8"
(1,6 cm)
Figure 5. Discharge Chute Mount
www.ferrismowers.com | www.snapperpro.com
D
C
E
F
H
1-1/2"
3/8" Drill

Advertisement

Table of Contents
loading

Table of Contents