Crane Barnes Simplex SGV Series Installation Manual

Flex hose system for pump

Advertisement

Quick Links

IMPORTANT!
Read all instructions in this manual before operating pump.
As a result of Crane Pumps & Systems, Inc., constant product improvement program,
product changes may occur. As such Crane Pumps & Systems reserves the right to
change product without prior written notification.
A Crane Co. Company
420 Third Street
Piqua, Ohio 45356
Phone: (937) 778-8947
Fax: (937) 773-7157
www.cranepumps.com
INSTALLATION MANUAL
Simplex
Flex Hose System
For Pump Series:
SGV, OGV & SGPC
(For Easy Identification: Pumps used with these basin
package will have one cord.)
SUPERSEDED
Some parts may NOT
be available
83 West Drive, Bramton
Ontario, Canada L6T 2J6
Phone: (905) 457-6223
Fax: (905) 457-2650
Form No. 110317-Rev. G

Advertisement

loading
Need help?

Need help?

Do you have a question about the Barnes Simplex SGV Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Crane Barnes Simplex SGV Series

  • Page 1 Read all instructions in this manual before operating pump. As a result of Crane Pumps & Systems, Inc., constant product improvement program, product changes may occur. As such Crane Pumps & Systems reserves the right to change product without prior written notification. A Crane Co. Company...
  • Page 2: Safety First

    Other brand and product names are trademarks or registered trademarks of their respective holders. ® Barnes is a registered trademark of Crane Pumps & Systems, Inc © Crane Pumps & Systems, Inc. 2001, 2002, 9/05, 5/06...
  • Page 3 USER GUIDE The grinder pump Congratulations on generates sufficient your purchase of a Barnes UltraGRIND™ grinder pressure to pump this slurry from your home to pump system. With proper care and by following the wastewater plant. a few simple guidelines your grinder pump will give you many years of dependable service.
  • Page 4: Before You Begin

    BEFORE YOU BEGIN • READ THIS MANUAL COMPLETELY BEFORE STARTING YOUR INSTALLATION. • CONSULT LOCAL OFFICIALS FOR ANY APPLICABLE CODES AND REGULATIONS. • DETERMINE THE BEST LOCATION FOR YOUR BASIN AND CONTROL PANEL (SEE FIG. 1). DO NOT DROP OR ROLL BASIN.
  • Page 5 CHART 1 BALLAST (in cubic yards) BASIN BASIN HEIGHT I.D. 48” 60” 72” 84” 96” 108” 120” 144” 24” 0.30 0.38 0.46 0.53 0.61 0.69 0.78 0.93 30” 0.48 0.60 0.71 0.84 0.96 1.08 1.21 1.45 36” 0.70 0.88 1.03 1.21 1.39 1.57...
  • Page 6 Location of Basin And Control Panel FIGURE 1...
  • Page 7 STEP 1. Hole Excavation, Bedding & Setting of the Basin STEPS & TIPS: • Refer To The Gravel Size Diagram For Acceptable Bedding Material Sizes. • Compact The Bedding Per ASTM D 2321 Specifications Outlined For Bedding. • Set The Basin Into The Hole Using A Cloth Lifting Strap As Shown In Figure 3a, Or A Chain And Spreader Bar Assembly To Lift The Basin On Units With Pre-cast Ballast Per Figure 3b.
  • Page 8 STEP 2. Discharge Connections & Backfill to Inlet Depth STEPS & TIPS: • A Flexible Pipe Coupling Or Fitting Is Recommended To Help Compensate For Settling Of Ground. • Make Sure The Required Redundant Check Valve Is Installed In Proper Direction. Flow Arrow Should Point Away From The Basin.
  • Page 9 STEP 3. Running Direct Burial Cable from Basin to Control Panel STEPS & TIPS: • All Penetrations Through the Basin MUST Be Sealed Watertight • Cord Grip Penetrations MUST be Made Using a Drill and Appropriate Tap. • Inlet Not Yet Connected - Shown For Reference Only •...
  • Page 10 STEP 4. Connecting “Pump Power Leads” - SGPC or SGPC w/CVP (Direct Burial Cable to Control Panel) STEPS & TIPS: • Check for nicks or damage to wire prior to installation • Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed •...
  • Page 11 STEP 4. Connecting “Pump Power Leads” - SGV (Direct Burial Cable to Control Panel) STEPS & TIPS: • Check for nicks or damage to wire prior to installation • Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed •...
  • Page 12 STEP 5. Connecting “Level Control Leads” (Direct Burial Cable to Control Panel) STEPS & TIPS: • Check for nicks or damage to wire prior to installation • Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed FIGURE 8...
  • Page 13 STEP 5. Remove Parts Box from Basin, Attach Rope to Pumps, Record Pump Data STEPS & TIPS: Remove Parts Box from inside basin. It should contain the following items • Lifting device, inlet fitting and vent (If required) • Remove Connector Protectors From Cord and Pump. •...
  • Page 14 STEP 7. Sliding Pump Into Basin STEPS & TIPS: • Once the lifting device is attached to the pump, secure it so it will not fall into basin. • Thread flex hose assembly into check valve on pump. Remove upper valve nut assembly as shown and secure to other end of the flex hose assembly.
  • Page 15 STEP 8A. Junction Box Wiring for SGV Pumps with “UltraSWITCH or FloatTREE” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
  • Page 16 STEP 8B. Junction Box Wiring for OGV & SGPC Pumps with “UltraSWITCH or FloatTREE” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
  • Page 17 STEP 8C. Junction Box Wiring for SGPC w/CVP Pumps with “UltraSWITCH or FloatTREE” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
  • Page 18 STEP 8D. Junction Box Wiring for SGPC w/CVP Pumps with “Individual Floats” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
  • Page 19 STEP 9. Power to Control Panel STEPS & TIPS: • Electrical Power Should Be Disconnected and Locked Out During This Part Of The Installation • Inspect Wires for nicks or Defects in the Cable Before Installing. • Check That Connection is Secure by pulling on Wires After Installed. •...
  • Page 20 STEP 10. Inlet Connection and Final Backfill STEPS & TIPS: • Inlet Should Not Interfere With Pump Removal Or Level Control Operation. • Inlet Should Have A Minimum 1/8” Per Foot Drop. If required only use 45° elbows. • Proper Backfill Should Be Done To Prevent Excessive Damage From Settling Per ASTM D 2321 As Outlined for Bedding.
  • Page 21 STEP 11. Sealing of Control Panel Conduit and Installation of Cover Gasket STEPS & TIPS: • Conduit Must Be Sealed To Prevent Water Infiltration ( Fig. 19). • Peal and Place Gasket on Clean/Dry Basin Rim Surface Inside Bolt Circle. •...
  • Page 22 Optional - Installation of Basin Cover & Control Panel Locks STEPS & TIPS: • Use the Illustration that represents your cover style. • Install the lock as shown in Figure 21. • The basin cover lock requires a 9/16” socket to tighten or loosen bolt. •...
  • Page 23 Basin Package Exploded View FIGURE 23...
  • Page 24: Parts List

    PARTS LIST ITEM PART DESCRIPTION Capscrew, #10-32 Capscrew, 1/4-20 x 2” Inlet (Field Installed) Hose Clamp Lifting Device Basin CHART 1 Junction Box Item #10 - UltraSWITCH 085115 Discharge Assembly - True Union BASIN PART No. PART No. Ball Valve - 1.25” NPT DEPTH OGV, SGPC Hose Assembly...
  • Page 25: Returned Goods

    Crane Pumps & Systems, Inc. Distributor. RETURNED GOODS RETURN OF MERCHANDISE REQUIRES A “RETURNED GOODS AUTHORIZATION”. CONTACT YOUR LOCAL CRANE PUMPS & SYSTEMS, INC. DISTRIBUTOR. Products Returned Must Be Cleaned, Sanitized, Or Decontaminated As Necessary Prior To Shipment, To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material.

This manual is also suitable for:

Barnes simplex ogv seriesBarnes simplex sgpc series