Read all instructions in this manual before operating pump. As a result of Crane Pumps & Systems, Inc., constant product improvement program, product changes may occur. As such Crane Pumps & Systems reserves the right to change product without prior written notification. A Crane Co. Company...
Page 3
USER GUIDE The grinder pump Congratulations on generates sufficient your purchase of a Barnes UltraGRIND™ grinder pressure to pump this slurry from your home to pump system. With proper care and by following the wastewater plant. a few simple guidelines your grinder pump will give you many years of dependable service.
BEFORE YOU BEGIN • READ THIS MANUAL COMPLETELY BEFORE STARTING YOUR INSTALLATION. • CONSULT LOCAL OFFICIALS FOR ANY APPLICABLE CODES AND REGULATIONS. • DETERMINE THE BEST LOCATION FOR YOUR BASIN AND CONTROL PANEL (SEE FIG. 1). DO NOT DROP OR ROLL BASIN.
Page 6
Location of Basin And Control Panel FIGURE 1...
Page 7
STEP 1. Hole Excavation, Bedding & Setting of the Basin STEPS & TIPS: • Refer To The Gravel Size Diagram For Acceptable Bedding Material Sizes. • Compact The Bedding Per ASTM D 2321 Specifications Outlined For Bedding. • Set The Basin Into The Hole Using A Cloth Lifting Strap As Shown In Figure 3a, Or A Chain And Spreader Bar Assembly To Lift The Basin On Units With Pre-cast Ballast Per Figure 3b.
Page 8
STEP 2. Discharge Connections & Backfill to Inlet Depth STEPS & TIPS: • A Flexible Pipe Coupling Or Fitting Is Recommended To Help Compensate For Settling Of Ground. • Make Sure The Required Redundant Check Valve Is Installed In Proper Direction. Flow Arrow Should Point Away From The Basin.
Page 9
STEP 3. Running Direct Burial Cable from Basin to Control Panel STEPS & TIPS: • All Penetrations Through the Basin MUST Be Sealed Watertight • Cord Grip Penetrations MUST be Made Using a Drill and Appropriate Tap. • Inlet Not Yet Connected - Shown For Reference Only •...
Page 10
STEP 4. Connecting “Pump Power Leads” - SGPC or SGPC w/CVP (Direct Burial Cable to Control Panel) STEPS & TIPS: • Check for nicks or damage to wire prior to installation • Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed •...
Page 11
STEP 4. Connecting “Pump Power Leads” - SGV (Direct Burial Cable to Control Panel) STEPS & TIPS: • Check for nicks or damage to wire prior to installation • Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed •...
Page 12
STEP 5. Connecting “Level Control Leads” (Direct Burial Cable to Control Panel) STEPS & TIPS: • Check for nicks or damage to wire prior to installation • Ensure Wire is Secured into Terminal Strip by Pulling on Wire After Installed FIGURE 8...
Page 13
STEP 5. Remove Parts Box from Basin, Attach Rope to Pumps, Record Pump Data STEPS & TIPS: Remove Parts Box from inside basin. It should contain the following items • Lifting device, inlet fitting and vent (If required) • Remove Connector Protectors From Cord and Pump. •...
Page 14
STEP 7. Sliding Pump Into Basin STEPS & TIPS: • Once the lifting device is attached to the pump, secure it so it will not fall into basin. • Thread flex hose assembly into check valve on pump. Remove upper valve nut assembly as shown and secure to other end of the flex hose assembly.
Page 15
STEP 8A. Junction Box Wiring for SGV Pumps with “UltraSWITCH or FloatTREE” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
Page 16
STEP 8B. Junction Box Wiring for OGV & SGPC Pumps with “UltraSWITCH or FloatTREE” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
Page 17
STEP 8C. Junction Box Wiring for SGPC w/CVP Pumps with “UltraSWITCH or FloatTREE” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
Page 18
STEP 8D. Junction Box Wiring for SGPC w/CVP Pumps with “Individual Floats” STEPS & TIPS: • Identify Which of The Following Style Junction Boxes is Used in your Package and Wire Per Illustrations Shown. • Inspect Wires for nicks or Defects Before Installing into the Junction Box. •...
Page 19
STEP 9. Power to Control Panel STEPS & TIPS: • Electrical Power Should Be Disconnected and Locked Out During This Part Of The Installation • Inspect Wires for nicks or Defects in the Cable Before Installing. • Check That Connection is Secure by pulling on Wires After Installed. •...
Page 20
STEP 10. Inlet Connection and Final Backfill STEPS & TIPS: • Inlet Should Not Interfere With Pump Removal Or Level Control Operation. • Inlet Should Have A Minimum 1/8” Per Foot Drop. If required only use 45° elbows. • Proper Backfill Should Be Done To Prevent Excessive Damage From Settling Per ASTM D 2321 As Outlined for Bedding.
Page 21
STEP 11. Sealing of Control Panel Conduit and Installation of Cover Gasket STEPS & TIPS: • Conduit Must Be Sealed To Prevent Water Infiltration ( Fig. 19). • Peal and Place Gasket on Clean/Dry Basin Rim Surface Inside Bolt Circle. •...
Page 22
Optional - Installation of Basin Cover & Control Panel Locks STEPS & TIPS: • Use the Illustration that represents your cover style. • Install the lock as shown in Figure 21. • The basin cover lock requires a 9/16” socket to tighten or loosen bolt. •...
Crane Pumps & Systems, Inc. Distributor. RETURNED GOODS RETURN OF MERCHANDISE REQUIRES A “RETURNED GOODS AUTHORIZATION”. CONTACT YOUR LOCAL CRANE PUMPS & SYSTEMS, INC. DISTRIBUTOR. Products Returned Must Be Cleaned, Sanitized, Or Decontaminated As Necessary Prior To Shipment, To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material.