Kohler REGATTA drop in 11303A-GAB-0 Installation Instructions Manual page 8

Bubble massage bath
Table of Contents

Advertisement

C.
Identify suitable blower installation and access positions
before proceeding with installation. A suitable power
outlet will also be required within 610mm of the blower.
See section H.
NOTE: NO MOTOR ACCESS NO WARRANTY
SERVICE. Ventilation must be provided in order to
allow heat from motor to dissipate.
���� �� ��� �������� ��� ������������ ���������
D.
IMPORTANT: Bath must be installed level on all top
edges.
E.
Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the trap at this time.
If a pop up waste/overflow has been selected as an accessory, then an extra overflow hole might require drilling.
The position of the overflow holes are shown on page 2. (Refer to part 'M' in the next section for cutting and drilling
instructions)
INSTALL THE BATH
CAUTION: Risk of product damage. Do not lift
the bath with airjets by the air channels or blower
motors, or use the air channels or blower motor
for structural support of the bath.
��� ������������ ���� �������������� ������ ��� �������� ������������ ������������ ���� ��� ���������
A. Option Using a Cement or Mortar Bed
NOTE: Do not use gypsum cement or drywall
compound for this application, as they will not provide
an acceptable, durable bond.
• Spread a 50mm thick layer of cement or mortar on
secure, level, and support the unit. Clear all the
material away from the support block locations.
• Position a piece of plastic drop cloth material on top
of the cement or mortar bed.
• With help, carefully lift the bath into place, and
make sure the support blocks do not rest in the bed
Material.
• Insert the drain tailpiece into the trap. Make sure the
bath is level and resting on all support blocks.
• Remove the protective tape from the rim.
1128227-A01-D Date: 13/8/2010
.
as necessary.
8
Blower Access*
CAUTION: Risk of product damage. Do not
support the bath by the rim.
Clear spaces
for support blocks.
Blower Access*
Blower Access*
Spread a 50mm Layer
of Cement or Mortar
Bed Material.

Advertisement

Table of Contents
loading

Table of Contents