Preparing The Chuck For Mounting On Machine Tool; Preparing The Chuck For Operation - Bison 2500 Instruction Manual

Hide thumbs Also See for 2500:
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 5
Chuck adapter plate and ring bracket
6.2
Preparing the chuck for mounting on the machine tool
To mount the chuck on the machine tool, please proceed as follows:
■ open the package,
■ check the delivery for completeness,
■ remove the distributor ring from the chuck,
■ lift the chuck using an eyebolt and remove from
the package,
■ place the chuck down in a position preventing its
movement,
■ lift the chuck with the crane using an eyebolt,
!
NOTE: Placing the chuck onto the jaws is
strictly forbidden!
10
The workstation should be equipped with the
compressed air connection, that contains a connector
block and shut-off valve (block valve).
The control system and tooling, operator should get
by himself or order.
For controlling, use the 2-way, 3-position valve in
a mid-position, connecting the chamber with the
atmosphere. (Fig. 4).
Control valve diagram
!
NOTE: The manufacturer does not provide
any
switches that work with chuck control
devices as well as any parts working with
Fig. 3
proximity switch devices.
■ place the distributor ring onto the chuck,
■ center the spindle towards to chuck, so the control
device arbors hit the appropriate holes of Ø14mm in
the adapter plate,
■ mount the chuck to the adapter plate,
■ mount the distributor ring,
■ check, whether during rotation the chuck does not rub
the ring, if it does then needs to be centered,
■ when dismounting from the machine tool, please
proceed in the reverse order.
4
2
3
1
pneumatic
equipment,
Fig. 4
proximity

Advertisement

Table of Contents
loading

Table of Contents