☐
2.
Replace Any Parts That Have Failed
☐
3.
Inspect/Clean Injectors and Brine Line
☐
4.
Photograph System for Job Folder
☐
5.
Record Pentair Serial Number
☐
6.
Perform Any Work Covered by Warranty (If Applicable, see notes)
☐
7.
Include 12 postage-paid water sample bottles per year, plus testing by WCC lab (if needed) (Results will include testing for
hardness, iron, TDS, pH)
☐
8.
Re-Examine Water Quality Levels (Hardness)
Notes:
_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
Billing Information
Name: __________________________________________________________________________________________________________________
Phone: __________________________________________________________________________________________________________________
Street: __________________________________________________________________________________________________________________
City/State/Zip: ____________________________________________________________________________________________________________
Purchase Order #: _________________________________________________________________________________________________________
Acceptance of Work:
Tech. Signature: ___________________________________________________________________________________________________________
Client Printed: ____________________________________________________________________________________________________________
Client Signature: __________________________________________________________________________________________________________
Water Control Corporation
7150 143rd Ave NW • Ramsey, MN 55303
Phone: 763-427-9638 • Fax: 763-427-5665
www.watercontrolinc.com
WCC MAINTENANCE PROCEDURES | PAGE 2/2