Date _______________________________________________________________________________________________________________________
Project Name/Location _______________________________________________________________________________________________________
Technician __________________________________________________________________________________________________________________
Model/Serial Number _________________________________________________________________________________________________________
Number/Size of Resin Tanks ___________________________________________________________________________________________________
Size of Brine Tank ____________________________________________________________________________________________________________
Brine Reclaim System ________________________________________________________________________________________________________
Installation Verification
☐
1.
Confirm the system O&M manual is onsite.
☐
2.
Confirm 120 VAC power supplied.
☐
3.
Verify water lines are all properly plumbed, and water is available.
☐
4.
Verify drain lines properly plumbed.
☐
5.
Verify meter(s) plumbed in correct direction.
☐
6.
Verify brine reclamation properly plumbed (if applicable).
☐
7.
Verify salt is available onsite
☐
Bypass installed? Yes ☐ No ☐ Master Bypass ☐ Each Valve ☐
8.
☐
9.
Water test kit provided to end user (only if specified).
☐
10.
Fully photographed system and system plumbing.
Pre-Startup
☐
1.
Install brine line tubing.
☐
2.
Install meter cables.
Commercial Water Softener
Startup Procedures
(TECHNICIAN TO INITIAL EACH ITEM SUCCESSFULLY TESTED.)
☐ Meter
☐ Timeclock
☐ Progressive Flow
☐ Alternating
An Employee-Owned Company
WCC STARTUP PROCEDURES | PAGE 1/3