Date _______________________________________________________________________________________________________________________
Project Name/Location _______________________________________________________________________________________________________
Technician __________________________________________________________________________________________________________________
Model/Serial Number _________________________________________________________________________________________________________
Number/Size of Resin Tanks ___________________________________________________________________________________________________
Size of Brine Tank ____________________________________________________________________________________________________________
Brine Reclaim System ________________________________________________________________________________________________________
Installation Verification
1.
Confirm the system O&M manual is onsite.
2.
Confirm 120 VAC power supplied.
3.
Verify water lines are all properly plumbed, and water is available.
4.
Verify drain lines properly plumbed.
5.
Verify meter(s) plumbed in correct direction.
6.
Verify brine reclamation properly plumbed (if applicable).
7.
Verify salt is available onsite
Bypass installed? Yes ☐ No ☐ Master Bypass ☐ Each Valve ☐
8.
9.
Water test kit provided to end user (only if specified).
10.
Fully photographed system and system plumbing.
Pre-Startup
1.
Install brine line tubing.
2.
Install meter cables.
Commercial Water Softener

Startup Procedures

(TECHNICIAN TO INITIAL EACH ITEM SUCCESSFULLY TESTED.)
☐ Meter
☐ Timeclock
☐ Progressive Flow
☐ Alternating