Maintenance Procedures - Water Control Corporation SF Series Owner's Manual

Table of Contents

Advertisement

Date ___________________________________________________________________________________________________________________
Project Name/Location ___________________________________________________________________________________________________
Technician ______________________________________________________________________________________________________________
Model/Serial Number _____________________________________________________________________________________________________
Pre-Maintenance Audit Checklist
1.
Test Water Quality Levels (Hardness on Cold/Hot)
Check for Blinking Time? Yes ☐ No ☐
2.
3.
Check Volume of Meter (Per System)
4.
Verify Appropriate Inlet Pressure (If Applicable)
5.
Verify System Outlet Pressure (If Applicable)
6.
Inspect Brine Tank and Overflow
7.
Check Brine Tank for Bridging/Salt Quality/Water Level
8.
Verify Correct Solenoid Valve Operation (If Applicable)
9.
Verify Correct Programming for Specific Softener
10.
Test/Verify Brine Reclamation Operation
11.
Check Inlet/Outlet Bypass
Scheduled Maintenance Procedures
1.
Cycle Test Water Softener (Manual Regeneration)
Check for Leaks
Check Meters Counts Down Properly
Check If Brine Line Draws Water
Check Brine Line Refill
Commercial Water Softener

Maintenance Procedures

(TECHNICIAN TO INITIAL EACH ITEM SUCCESSFULLY TESTED.)
An Employee-Owned Company
WCC MAINTENANCE PROCEDURES | PAGE 1/2

Advertisement

Table of Contents
loading

Table of Contents