Date ___________________________________________________________________________________________________________________
Project Name/Location ___________________________________________________________________________________________________
Technician ______________________________________________________________________________________________________________
Model/Serial Number _____________________________________________________________________________________________________
Pre-Maintenance Audit Checklist
☐
1.
Test Water Quality Levels (Hardness on Cold/Hot)
☐
Check for Blinking Time? Yes ☐ No ☐
2.
☐
3.
Check Volume of Meter (Per System)
☐
4.
Verify Appropriate Inlet Pressure (If Applicable)
☐
5.
Verify System Outlet Pressure (If Applicable)
☐
6.
Inspect Brine Tank and Overflow
☐
7.
Check Brine Tank for Bridging/Salt Quality/Water Level
☐
8.
Verify Correct Solenoid Valve Operation (If Applicable)
☐
9.
Verify Correct Programming for Specific Softener
☐
10.
Test/Verify Brine Reclamation Operation
☐
11.
Check Inlet/Outlet Bypass
Scheduled Maintenance Procedures
☐
1.
Cycle Test Water Softener (Manual Regeneration)
☐
Check for Leaks
☐
Check Meters Counts Down Properly
☐
Check If Brine Line Draws Water
☐
Check Brine Line Refill
Commercial Water Softener
Maintenance Procedures
(TECHNICIAN TO INITIAL EACH ITEM SUCCESSFULLY TESTED.)
An Employee-Owned Company
WCC MAINTENANCE PROCEDURES | PAGE 1/2