Download Print this page

Toto NEOREST LE Instruction Manual page 10

Hide thumbs Also See for NEOREST LE:

Advertisement

Available languages

Available languages

Turning on the power and preparing the unit
The mains plug is behind the right cover panel.
Follow the same procedures for both right and left cover panels when attaching and removing them.
Be careful! Dropping could cause damage!
1
1
Remove the cover panel.
Use a at-blade screwdriver to loosen the screws on the bottom of the cover panel (right), pull it out by the
bottom slightly, and then pull the cover down and out.
2
2
Insert the mains plug in the socket.
The "POWER" indicator lights automatically.
The toilet ushing starts automatically.
3
3
Reattach the cover panel.
Align the cover panel (right) with the panel attachment guideline and x it by tightening the bottom screws with
a at-blade screwdriver.
GB
16
Cover panel (right)
Cover panel (right)
(2) Pull up
(2) Pull up
(3) Pull out
(3) Pull out
(1) Loosen
(1) Loosen
Screw
Screw
(1) Insert at an angle
Attachment
from below.
xture
(2) Align with the panel
attachment guideline
and x in place.
(3) Tighten screws.
Screw
Screw
Panel attachment guideline
Panel attachment guideline
Opening the water shut-off valve
1
1
Turn the water shut-off valve in the direction of the arrow to open it
completely.
Checking the main display section
Is the main display section "POWER" indicator lit?
If the "POWER" indicator is not lit, none of the functions can be used.
(Excluding when Energy Saver is in use.
See page 27.)
Press
in the main operation section. (The "POWER" indicator lights.)
Check here
Main display section
Lights
Turning off the power
Press
to turn off the power.
The "POWER" indicator goes off.
Turn anticlockwise and
open completely
Check here
Main operation section
GB
17

Advertisement

loading

This manual is also suitable for:

Neorest seCw997dfCw998df