Prior To Installation - T&S EC-3113 Series Installation And Maintenance Instructions Manual

Chekpoint ligature resistant faucet: deck mount, 4” centerset cast spout
Table of Contents

Advertisement

Important :
FR
• TOUT LE CÂBLAGE ÉLECTRIQUE DOIT ÊTRE INSTALLÉ CONFORMÉMENT AUX CODES ET
RÉGLEMENTATIONS NATIONAUX/LOCAUX.
• TOUTE LA PLOMBERIE DOIT ÊTRE INSTALLÉE CONFORMÉMENT AUX CODES ET RÉGLEMENTATIONS
APPLICABLES.
• PRENEZ LES PRÉCAUTIONS APPROPRIÉES LORS DE LA CONNEXION DU TRANSFORMATEUR À UNE
SOURCE D' A LIMENTATION EN 120 VCA.
• NE BRANCHEZ PAS LE TRANSFORMATEUR DANS LA SOURCE D' A LIMENTATION (LA PRISE DE
COURANT) TANT QUE LE CÂBLAGE N'EST PAS TERMINÉ.
• RINCEZ TOUTES LES CONDUITES D'EAU JUSQU' À CE QUE L'EAU SOIT LIMPIDE AVANT DE RACCORDER
LE ROBINET AUX VANNES D' A RRIVÉE D'EAU.
Tools Required For Installation of Faucets
EN
· 8" (200mm) adjustable wrench
· Phillips head screwdriver, #1
· Basin wrench
Herramientas requeridas para la instalación de los grifos
ES
· Llave ajustable de 8" (200 mm)
· Destornillador de cabeza Phillips, n.° 1
· Llave para lavabo
Outils nécessaires pour l'installation des robinets
FR
· Clé à ouverture variable de 8 po. (200 mm)
· Tournevis cruciforme, No 1
· Clé pour lavabo

Prior to Installation:

EN
Prior to installing the T&S ChekPoint Series Faucet, install the items
listed below. Also, refer to Figure 1.
• Provide electrical receptacle within approximately 6' from sink
for plug-in transformer — 120 VAC, 2 amp service for each
plug-in transformer used.
• Scrub or wash-up sink
• Drain line
• Hot and cold water supply lines
· Pliers
· Pinzas
· Pince
5
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec-3113-vf05

Table of Contents