Download Print this page

Removal Of Pcbs - Daikin RKS09HV2S Service Manual

2.0/2.5/3.5 kw class 9000/12000 btu/h class

Advertisement

Removal of PCBs

3. Removal of PCBs
Procedure
Step
1. Remove the main PCB
and the forced operation
button PCB.
Layout of the main PCB
1
Remove the screw on
2
the terminal board.
Release the 2 earth
3
wires.
14
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Main PCB
You can remove the main
PCB when you disconnect
the lead wires on the
terminal board without
removing the electrical box.
Forced operation
button PCB
(R13506)
Terminal
board
(R11854)
Earth
wire
(R17020)
Si001156
Points
Removal Procedure

Advertisement

loading