Download Print this page
Premier Mounts MVWS-3X3 Series Installation

Premier Mounts MVWS-3X3 Series Installation

Modular video wall headers

Advertisement

Quick Links

Modular Video Wall Headers Installation
MVWS-3X3 SERIES
1/2"-13 Washer (Qty. 8)
Lifting Shackle (Qty. 4)
1/2"-13 Nut (Qty. 8)
1/2"-13 Bolt (Qty. 8)
ying header assembly
MVWS-2X2 SERIES
1/2"-13 Washer (Qty. 6)
Lifting Shackle (Qty. 2)
1/2"-13 Nut (Qty. 6)
1/2"-13 Bolt (Qty. 6)
ying header assembly
*Hardware and components for hanging are not provided with header.
Note: properly quali ed installation personnel and hardware are strongly recommend
when ying video walls to ensure proper compliance with local codes.
North America 800.368.9700 | International +1-714-632-7100 | www.mounts.com
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the MVWS-3X3 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Premier Mounts MVWS-3X3 Series

  • Page 1 Modular Video Wall Headers Installation MVWS-3X3 SERIES 1/2”-13 Washer (Qty. 8) Lifting Shackle (Qty. 4) 1/2”-13 Nut (Qty. 8) 1/2”-13 Bolt (Qty. 8) ying header assembly MVWS-2X2 SERIES 1/2”-13 Washer (Qty. 6) Lifting Shackle (Qty. 2) 1/2”-13 Nut (Qty. 6) 1/2”-13 Bolt (Qty.
  • Page 2 If available, the oor base assembly will aid greatly in the installation and alignment of the displays on the wall frame prior to ying the wall. Base Assembly There are 5 mounting holes available for attaching the shackles to provide di erent angles of tilt. The second hole from the front will hang the straightest in most cases.
  • Page 3 Step 2 Secure the head using the 1/2-13” bolts, washer and 1/2”-13 Washer nuts. Note: Use only the grade eight hardware supplied to 1/2”-13 Nut mate the header assembly to the top of the wall frame! Using lower grade hardware could compromise the integrity and safety of the installation.