Condensate Run Off - iDM TERRA AL 60 Max Technical Documentation Installation Instructions

Air-water-heat pumps for outdoor installation with navigator 2.0 controler
Table of Contents

Advertisement

4. General description
Placement and Installation
4.14. Condensate run off
concrete base
Special actions have to be set for the appearing condensate. As a result of a defrosting circle
up to 15 lt. condensate within 2 minutes can occur on every evaporator unit. It must be ensured,
that the condensate is discharged. The condensate outlet must be secured by the pre-mounted
heating cable. The heating cable extends approx. 1 m into the drain hose
To avoid overheating or a defect of the condensation run-off heating, following points must be
observed. The heating cable must not be laid in loops, and only as a single cable. The heating
cable must not touch itself (grinding - minimum distance 50 mm). Smallest bending radius 25 mm.
22
Well/pipe
condensation
run off
Installation instructions TERRA AL 60 Max
concrete base
min. 200 mm
300 mm
Canalisation
(C) IDM Energiesysteme GmbH
heating side connectio
electrical connections