Page 1
(6) 2”, 3”, 4”, 5”, 6” or 8” high legs (depending on style of Roverpet Puppy Rail System ordered) Assembly Procedure Special Notes: If your Roverpet 6’x6’ whelping box consists of a door panel, it needs to be configured with the door located on the right or center of the whelping box side to allow door hinge clearance.
Page 2
4 legs installed in Step 2 are positioned in the same direction. 6.) Take the assembled Roverpet Puppy Rail System and lower one side of the rails into your Roverpet whelping box. Line up the #PR72LB connecting ends with the 2nd vertical bars of the whelping box panels.
Page 3
7.) Clip the #PR72LB connecting ends around the vertical bars. 8.) With the one side of the #PR72LB installed on the vertical bars, slide the high-side of the Roverpet Puppy Rail System down into the Roverpet whelping box. Make sure the #PR72LB connecting ends are installed in the same manner as in the prior step.
Need help?
Do you have a question about the 66PR and is the answer not in the manual?
Questions and answers