Electro Industries/GaugeTech Shark 100 Quick Start Manual

Electro Industries/GaugeTech Shark 100 Quick Start Manual

Hide thumbs Also See for Shark 100:

Advertisement

CAUTION! Installation of the Shark® 100 meter must be performed only by qualified personnel who fol-
low standard safety precautions during all procedures. Those personnel should have appropriate training
and experience with high voltage devices. Appropriate safety gloves, safety glasses and protective cloth-
ing are recommended.
During normal operation of the Shark® meter, dangerous voltages flow through many parts of the unit, includ-
ing: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules
and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid
contact with any current-carrying surfaces.
Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can
only be used as secondary protection.
IMPORTANT! Refer to your meter's Installation and Operation Manual for additional safety warnings before
performing installation, wiring, or maintenance of your meter. See the link to the manual, below.
NOTE: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter oper-
ation and programming information, refer to your meter's Installation and Operation Manual and the Communica-
torPQA® and MeterManagerPQA® Software, EnergyPQA.com® AI Driven EMS User Manual on EIG's website.
User Manual:
https://www.electroind.com/products/shark-100-power-and-energy-meter-transducer/
From the webpage, click Technical Documents>User Manual.
Software Manual:
https://www.electroind.com/products/communicatorpqa-software-application-5/
From the webpage, click Technical Documents>User Manual.
CommunicatorPQA
TM
https://www.electroind.com/products/communicatorpqa-software-application-5/
From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email sales@elec-
troind.com or call 516-334-0870.
All EIG's metering and software products' literature can be accessed from:
https://www.electroind.com/all-products/
For software and metering integration, EIG's Technical Support Engineers are available on an hourly or daily basis to
help with typical commissioning assistance, which includes:
Verifying meter installation and wiring.
Verifying proper system integration.
Working with 3rd parties to ensure cross compatibility.
Advising users on best practices for optimal implementation.
You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.
Electro Industries/GaugeTech
Powered by Innovation™
Shark® 100 Meter Quickstart Guide
Setup Software:
#
Doc
E145703
Shark® 100 Meter Quickstart
V.1.14
QS - 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Shark 100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Electro Industries/GaugeTech Shark 100

  • Page 1 Working with 3rd parties to ensure cross compatibility. • Advising users on best practices for optimal implementation. You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870. Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 1...
  • Page 2 Earth Ground phase, 3 wire phase, 3 wire LOAD LOAD NOTE: Other wiring configurations are available. See the Shark® 100 meter User Manual (see page QS-1 for the download link). Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 2 Powered by Innovation™...
  • Page 3 Scaling is shown in the second line. Press the DOWN ARROW to choose another MENU ENTER value. You can choose 1, 10, 100, or 1000. NOTE: See example CT and PT settings on page QS-5. Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 3...
  • Page 4 Address 1, Baud Rate 57.6 and Protocol Mod rtU. See the Shark® 100/100T Meter Installation and Operation Manual (see page QS-1 for the download link) for additional configuration instructions for the Shark 100 meter’s Ethernet port ® Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 4...
  • Page 5 After 10 seconds, the Device Profile reverts to the actual Device Profile in use. This is one way you can always connect to the meter. The Factory Initial Default Settings are: Device Address:1 Baud Rate:57600 Protocol:Modbus RTU Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 5...
  • Page 6 Click OK to close the Device Status screen. 6. Click the Profile button on the Icon bar. 7.The Device Profile screen opens. The tabs on the top of the screen let you choose setting screens. Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 6...
  • Page 7 IrDA (COM1 and RS485 (COM2) ports. You can change the settings, if necessary for your application. To revert to the default RS485 port settings, click Set COM2 to default. Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 7...
  • Page 8 The meter will reboot and then you can reconnect to it. Note that you can also click Save Profile to save your changes without sending them to the meter. Shark®, CommunicatorPQA®, MeterManagerPQA®, and EnergyPQA.com® are registered trademarks of Electro Industries/Gauge- Tech. https://electroind.com/ Electro Industries/GaugeTech ™ E145703 V.1.14 QS - 8...

Table of Contents