Summary of Contents for Electro Industries/GaugeTech Shark NEMA 1

  • Page 1 V.1.09 May 3, 2018...
  • Page 2 This page intentionally left blank.
  • Page 3 Electro Industries/GaugeTech. © 2018 Electro Industries/GaugeTech Shark® is a registered trademark of Electro Industries/GaugeTech. The distinctive shapes, styles and overall appearances of all Shark® meters are trademarks of Electro Industries/GaugeTech.
  • Page 4: Product Warranty

    516-334-0870 or fax 516-338-4741. Product Warranty Electro Industries/GaugeTech warrants all products to be free from defects in material and workmanship for a period of four years from the date of shipment. During the warranty period, we will, at our option, either repair or replace any product that proves to be defective.
  • Page 5: Use Of Product For Protection

    Statement of Calibration Our instruments are inspected and tested in accordance with specifications published by Electro Industries/GaugeTech. The accuracy and a calibration of our instruments are traceable to the National Institute of Standards and Technology through equipment that is calibrated at planned intervals by comparison to certified standards.
  • Page 6 GaugeTech changed the face of power monitoring forever with its first breakthrough innovation: an affordable, easy-to-use AC power meter. More than forty years since its founding, Electro Industries/GaugeTech, the leader in power monitoring and control, continues to revolutionize the industry with the highest quality, cutting edge power monitoring and control technology on the market today.
  • Page 7: Table Of Contents

    2.3.2: Door Locking Instructions 2-18 3: Electrical Wiring 3.1: Wiring Instructions 3.2: 3 Wire Delta, 3 CT Hookup Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 TOC-1 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 8 5: Maintenance 6: Ordering Information A: Removing a Meter from Service A.1: Removing the Meter A.2: Reinstalling the Meter Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 TOC-2 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 9: 1: Introduction

    EIG. All claims should be as specific as possible and include general order numbers. You will find a plastic bag of instruction booklets and/or CDs in the shipping container. Store these documents in a safe place. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 10: Safety Precautions

    The temperature rating for enclosure storage is (-20 to +50) 1.4: Compliance UL / cUL Listed, file number: E358101. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 11: 2: Installation

    Extreme care shall be taken when mounting the enclosure, and making wire entry holes, to prevent metal chips, filings, and other contaminants from entering the enclosure which may damage the equipment and create a hazardous condition. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 12 à terre pour prévenir les articules métalliques, rem- plissage et autre contaminant de l'entrée de l'enceinte qui peuvent provoquer une condition dangereuse de l'équipement. Figure 2.1: 120V Internal Wiring Schematic Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 13 2: Installation Figure 2.2: 277V Internal Wiring Schematic Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 14: Recommended Procedures For Wire Entry Hole Cutting

    EIG recommends. See CAUTIONS on next page. NEMA 1 Enclosure NEMA 4X Enclosure Figure 2.3: Location of Recommended Punch Entries Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 15 IMPORTANT! • All wire entry into the enclosure shall be accomplished with the use of recognized fittings or strain reliefs. Bare holes shall not be used. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 16 Liquid Tight raccords de conduits électriques de telle sorte que l'enceinte reste étanche à l'eau. Voir l'exemple de la Figure 2-5. PRUDENCE! Si raccord est pas étanche aux liquides, il pourrait causer une situation dangereuse. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 17 Liquid Tight! Figure 2.5: NEMA 4X Enclosure with Liquid Tight Fitting (Example) Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 18: Installation For The Nema 1 Enclosure

    Refer to the following diagrams for the NEMA 1 enclosure and mounting dimensions. See Section 2.3 for the NEMA 4X enclosure instructions. Figure 2.6: NEMA 1 Enclosure Front Dimensions Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 19 2: Installation Figure 2.7: NEMA 1 Enclosure Side Dimensions Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 20 2: Installation Figure 2.8: NEMA 1 Enclosure Mounting Hole Dimensions Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-10 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 21: 1: Installation Steps

    4. Tighten all four mounting bolts after any required shimming is completed. See the figure below. Mounting Bolts (4) Figure 2.10: Mounting Bolt Location Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-11 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 22: 2: Door Locking Instructions

    The padlock bracket can be secured in place with a padlock (3/8 inch shackle diameter). See the figure below. Enclosure secured with padlock Figure 2.11: Door with Lock Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-12 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 23: Installation For The Nema 4X Enclosure

    ATTENTION! Le boîtier NEMA 4X est conçu pour une utilisation en extérieur. NE PAS installer l'enceinte en plein soleil. Il doit être installé dans un endroit ombragé, et non exposé à la lumière solaire directe. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701...
  • Page 24 2: Installation Figure 2.12: NEMA 4X Enclosure Front Dimensions Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-14 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 25 2: Installation Figure 2.13: NEMA 4X Enclosure Side Dimensions Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-15 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 26 2: Installation Figure 2.14: NEMA 4X Enclosure Mounting Dimensions Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-16 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 27: 1: Installation Steps

    Use shims, if required, to prevent deformation of the enclosure when tightening the bolts, if the mounting surface is distorted. 4. Tighten all four mounting bolts after any required shimming is completed. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-17...
  • Page 28: 2: Door Locking Instructions

    The padlock brackets can be secured in place with two padlock (3/8 inch shackle diameter). See the figure below. Enclosure secured with padlocks Figure 2.16: Door Locking on NEMA 4X Enclosure Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 2-18 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 29: 3: Electrical Wiring

    #12 max CU #8-32 6 lbf-in (0.68 N-m) Earth Ground #10-12 AWG CU #8-32 10 lbf-in (1.2 N-m) Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 30: Wiring Instructions

    First connect Earth Ground as shown in the figure below. AVERTISSEMENT! Branchez d'abord la mise à la terre comme indiqué dans le dessin ci-dessous. Figure 3.1: Earth Ground Connection NEMA 1 Enclosure Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 31 PRÉSENTE QUI PEUT PROVOQUER DES BLESSURES GRAVES POU LA MORT. METTRE HORS TENSION TOUS LES CONDUCTEURS AVANT DE COMMENCER LA RÉALISATION D'UNE ACTIVITÉ DE CÂBLAGE DANS L'ENCEINTE DE L'ASSEMBLAGE SHARK®. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 32 3: Electrical Wiring Figure 3.2: Wye Wiring for 120V Model Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 33 3: Electrical Wiring Figure 3.3: Wye Wiring for 277V Model Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 34: Wire Delta, 3 Ct Hookup

    2. Press the DOWN ARROW once. CFG (Configuration) moves to the top of the display. RIGHT Arrow DOWN Arrow Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 35 MENU ENTER made, press the ENTER button. You will see the confirmation screen (Stor ALL done) and then the meter resets. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 36 3: Electrical Wiring This page intentionally left blank. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 37: 4: Operation

    <2 Ohms. 2. With the unit fully powered, measure the voltage on the input side and output side of the fuse. The voltages should differ by less than 1 Volt. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701...
  • Page 38 4: Operation This page intentionally left blank. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 39: 5: Maintenance

    If you ever need to remove the meter from service, refer to Appendix A: Removing a Meter from Service on page A-1. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 40 5: Maintenance This page intentionally left blank. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 41: 6: Ordering Information

    ENC4XSHK50B - 277 1. Model: ENCSHK50B - Shark® 50B Meter in NEMA 1 Enclosure ENC4XSHK50B - Shark® 50B Meter in NEMA 4X Enclosure Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 42 Harmonics counters 6. Power Supply: D2 Option: Universal, (90 to 265) VAC @50/60Hz or (100 to 370) VDC Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 43 ENC4XSHK100B-277-60-10-D2 (Shark® 100B meter in NEMA 4X enclosure with 277 Volt option with Control Power Transformer, 60 Hz System, 5 Amp Secondary, and D2 power supply) Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 44 INP100S: 10/100BaseT Ethernet RO1S: 2 Relay outputs/2 Status inputs PO1S: 4 Pulse outputs/4 Status inputs 1mAOS: 4 Channel Analog output 0-1 (bidirectional) Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 45 (Shark® 200 meter in NEMA 1 enclosure with 277 Volt option with Control Power Transformer, 60 Hz System, 5 Amp Secondary, V-2 V-Switch™ key, D2 power supply, 10/100BaseT Ethernet in Card Slot 1 and no card in Card Slot 2) Electro Industries/GaugeTech Electro Industries/GaugeTech E173701...
  • Page 46 6: Ordering Information This page intentionally left blank. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 47: A: Removing A Meter From Service

    The brass screws need to be screwed down until the end of the screw makes contact with the terminal strip below, enabling the brass bar to become electrically common with the terminal strip. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 48 CT's. Shorting Block/Screw Location Figure A.1: Shorting Block Location Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 49 5. Unscrew and disconnect the 6 current leads to the meter. 6. Disconnect all connectors to the meter. 7. Remove the 4 mounting nuts. 8. Remove the meter. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...
  • Page 50: A.2: Reinstalling The Meter

    Figure A.2: Shorting Screws Returned to Their Storage Positions 7. Verify that no foreign material remains inside the enclosure - if there is any, clean it out. 8. Energize all circuits and verify operation. Electro Industries/GaugeTech Electro Industries/GaugeTech E173701 The Leader In Power Monitoring and Smart Grid Solutions...