Wiring Check; Putting Into Operation - COMAC CAL FLOW 32 Installation And Technical Conditions

Table of Contents

Advertisement

After completion of wiring, it is necessary to check:
- Connecting cables for damage.
- Cables for pull relief.
- Correct connection of cables to terminals.
- Whether the supply voltage corresponds with the nameplate data.
Prior to connection to power supply, check the device installation accuracy in accordance
with "Installation in pipeline" and "Wiring" chapters.
Do not power up the meter during installation before the system is filled with the measured
medium and power off the meter before the system is discharged. After the meter is powered
up, the green LED on the top cover next to the M12 connector is lit, confirming the supply
voltage on the control PCB and stabilization of parameters of the meter takes place afterwards
(approx. 5 sec). After that period of time, the meter starts measuring.
Meter status:
It is continuously displayed by two indicator LEDs located in the evaluation unit top cover.
The meter status indicated by the LEDs can be as follows:
LED1
green
green
red LED
red LED
-
Flow direction:
The arrow indicates the direction liquid flow inside the sensor and thus the correct
orientation of the meter's sensor for installation in piping.
FLOW 32 manual

Wiring check

Putting into operation

LED2
The meter is in good order and the flow is null or
-
The meter is in good order and the flow is positive
blue LED is
where the blue LED is indicating the transmission of
flashing
-
Meter is out of order, service necessary
yellow LED
Meter is temporarily beyond parameters
-
Description
negative
volumetric pulses
Supply voltage error
Page 11 (total 18)
Current
output
4mA
4÷20mA
<4mA
<4mA
-
COMAC CAL s.r.o.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FLOW 32 and is the answer not in the manual?

Table of Contents