Sharp CV-P09LX Service Manual page 28

Portable air conditioner
Table of Contents

Advertisement

CVP09LX
Operation stops immediately and a
TIMER, OPERATION, and MEGA
COOL lamp blink.
(Indicated of filled with water)
Should be performed drainage.
(See "If the unit stops operating
and the TIMER,OPERATION and
MEGA COOL lamps are blinking."
of page 2-7.)
Can condensation water be drained?
YES
Should be performed drainage.
(See step 6 and 7 "Whenever the unit
is moved." of page 2-7.)
Should be removed the cabinet.
Should be checked movement
of the float ass'y.
GOOD
Should be set it as Step 3 in
test mode.
(See "Test mode" of page 4-4.)
When there is 1st. Micro switch
operation sound can be heard,you
move the float ass'y gradually upward,
and does TIMER lamp (yellow)
put out the light?
Go off
Should be canceled Step 3
in test mode.
*Operation stop.
Should be checked whether to have got
dust etc. blocked in the circulation course
of drainage water.
There are
no dust.
Complete.
Should be performed drainage.
(See step 6 and 7 "Whenever the unit is moved."
of page 2-7.)
*CAUTION
It is possibility that the tank inside the unit
has filled with condensation water.
(approx. 0.6 gallons.)
Therefore move a unit to the place with
NO
drainage equipment carefully so that the water
may not be spilt.
Then should be performed drainage.
Should be removed the cabinet.
Are disconnecting of "CN2" on the
PWB and pump lead wire?
Connecting
Isn't pump lead wire broken?
GOOD
Should be set it as Step 3 in
test mode.
(See "Test mode" of page 4-4.)
Measure the voltage at "CN2"
on the PWB and pump lead wire.
115V(over 100V)
Should be checked
the drain pump ass'y(drain motor and
pump body etc.).
GOOD
Should be canceled Step 3
in test mode.
*Operation stop.
NG
Repair or change the float ass'y.
Are disconnecting of "CN12"
Light up
on the PWB and micro switch
lead wire?
Connecting
Isn't micro switch lead wire broken?
GOOD
Should be checked micro switch
of upper side(pump control).
GOOD
There are
Should be performed cleaning and
dust.
change of dribller,drain valve ass'y
and drain hose.
5 – 5
Disconnecting Connect them properly.
NG
Change the pump lead wire.
Under 100V
Change the PWB.
NG
Change the drain pump ass'y.
Disconnecting
Connect them properly.
NG
Change the D-F-S board unit.
NG
Change the micro switch
of upper side(pump control).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cv-p10lc

Table of Contents