Operation; Commissioning - Judo BIOSTAT 25 TGA Installation And Operating Instructions Manual

Water treatment device
Table of Contents

Advertisement

5.

Operation

ATTENTION
(see
chapter
"Safety
dangers due to non-compliance")
Always observe the chapter "Intended Use"!
5.1

Commissioning

For safety reasons, the water treatment
device must be vented immediately after
having been connected with the water
supply.
– Set the bypass valve (if mounted) to the
setting "Operation".
– Turn on a water tap mounted after the
water treatment device.
– The power supply must be freely acces-
sible.
Electrical circuit
1 5 m³
2 10 m³
3 20 m³
4 40 m³
5 Ox 1
6 Ox 2
7
8
DIP switch
Fig. 7:
Electrical circuit
Operation
information
and
LEDs
manual
pushbutton
JUDO BIOSTAT 25 TGA
Connect the water treatment device
to the power supply. Plug the power
supply into the socket.
After the power supply has been connected,
the electrical circuit performs a self-check of
all the functions and parameters stored in
the electronics.
Following a successful check, all control
lamps flashes four times.
As soon as LED 1 shows a continuous
green light indicating "Operation", the water
treatment device is ready for use. When
water is flowing, the green LED 1 flashes
(see chapter "Control lamps, manual push-
buttons").
13