Download Print this page

The Andersons DI2020 Assembly Instructions Manual page 5

Professional 75lb dual impeller broadcast spreader

Advertisement

ASSEMBLY & OPERATIONS MANUAL
ASSEMBLY:
20 minutes
STEP 8.1: Attach control rods to spreader shut off
pivots. Install one 5/16" hex nut (8.1) on each
control rod as close as possible, to the halfway point
of the threaded portion. Look at the rods and make
sure the initial nut is threaded equally up the rod,
this is to give you a clean starting point for
calibration.
8.1
4 x
Insert control rods into pivot assembly. Note the
position of the 90 Degree brackets at 8.1. The
brackets must be in an upright position. Once the
control rods are inserted, place the remaining two
5/16" hex nuts (8.1) on the bottom of the control
rod. Finger-tighten these nuts in place, they will be
adjusted during calibration.
See CALIBRATION section at the end of these
assembly instructions. See Figure 8.3 for close-up
drawing.
.
STEP 8.2 - Insert the curved end of control
rods through the shut off handle levers and
secure with the two infinity spring clips
(8.2). See Figure 8.4 for close-up.
2 x
8.2
Attach control rods to shut off pivots- Figure 8.4
P80000_M52098_Rev_June2020
8.2
8.2
8.1
Figure 8.3 – attach control
rods at bottom
Thread up, opening
shut off
Thread down, closing
shut off
8.1
PAGE 5

Advertisement

loading

Related Products for The Andersons DI2020