Battery Replacement - Mastech MS8265 Operator's Instruction Manual

Table of Contents

Advertisement

5.2 Battery Replacement

To avoid false readings, which could lead to
possible electric shock or personal injury,
replace the battery as soon as the battery
indicator (
) appears.
Before replacing the battery, disconnect test
leads and/or any connectors from any circuit
under test, turn the meter off and remove test
leads from the input terminals.
To replace the battery:
Turn the meter off.
Disconnect test leads and/or any connectors from
the terminals.
• Use a screwdriver to unscrew the two screws
secured on the battery cover.
Take out the battery cover from the meter.
Remove the used batteries.
Replace with the new 9V batteries (6F22).
• Rejoin the battery cover and secure by the two screws.
25
Figure 2. Battery and Fuse Replacement
CAUTION
Using this appliance in an environment with a
strong radiated radio-frequency electromagnetic
field (approx. 3V/m), may influence its measuring
accuracy. The measuring result can be strongly
deviating from the actual value.
26
Battery cover
9V Battery

Advertisement

Table of Contents
loading

Table of Contents