Maico ER GH AP Installation And Operating Instructions Manual page 12

Surface-mounted exhaust air system for single-duct air extraction according to din 18017-3
Table of Contents

Advertisement

8 Mounting preparations
12 Main duct (steel
folded spiral-
seams duct)
16 Shaft wall
18 Floor ceiling
21 Duct fastener
23 Steel folded
spiral-seams duct
25 Suspended ceil-
ing
27 Steel duct bend
27.
Metal expansion
2
dowel
29 Retaining bolt
Keep a maximum distance of 1.5 m between
the duct fastenings. It is essential to observe
the installation instructions: Mounting prepara-
tions [} 9].
12
15 Spigot
17 Ceiling com-
pound
20 Steel threaded
rod / stair bolt
22 Duct clamp /
clamping band
24 Wall/board seal
26 Steel screws or
steel blind rivets
(3 of each)
27.
Anchor bolt /
1
steel dowel
28 Retaining bolt
with nut
30 Steel clamping
band
Duct attachment with duct clamp,
alternatively duct attachment with clamping
band
Danger due to fire transmission
DANGER Danger to life due to fire trans-
mission if an incorrect connection duct is
used on the APB housing when installed in
the ceiling.
Always use steel folded spiral-seams ducts for
the connection.
DANGER Danger to life due to fire trans-
mission in case of faulty ceiling compound.
It is essential that the remaining gap between the
main duct and the wall or ceiling is completely
sealed with non-flammable materials that are res-
istant to deformation. For example, use concrete
or cement mortar.