Appendix B - Startup Check List - M Pumps CN SEAL-MV Series User Manual

Bare frame pump with motor
Table of Contents

Advertisement

APPENDIX B – Startup check list
Nr.
*UPON ARRIVING CHECKS:
1
Check Pump Name Plate , Motor Name plate to tally with PO and Data Sheet
2
Any Cracks or damages to Pump or motor during shipment or handling
3
Check accessories if ordered to tally with PO
Are Installation, Operation and Maintenance Manuals for Pump, Motor and
4
Coupling supplied?
Have you received the Pump Curve, GA Drawing, Pump Data Sheet, Motor
5
Data Sheet and Wiring Diagram?
6
Have you read through and understand the IOM manuals?
*INSTALLATION CHECKS:
1
Has the Pump's baseplate being properly level and firmly secured?
2
Has the Pump and motor coupling being secured and aligned?
Are Suction and Discharge Pipe line with Flexible Joints being Supported and
3
Secured?
4
Any undue Pipe loading onto Pump inlet/Outlet Nozzle due to Mis-alignment
5
Is Suction Strainer being installed to protect the Pump?
Are Suction and Discharge Pressure Gauge being installed before Pump's Inlet
6
and Outlet?
7
Is there any Check Valve being installed at Pump's discharge Outlet?
8
Has the Power supplied for Electrical Motor being connected by qualified
electrical personnel?
Pag. 46/49
PUMP SERIES CN SEAL-MV
- Do not destroying – do not modify -
STARTUP CHECK LIST
Description of activity
Doc. ISM0076_MANUALE_CN SEAL-MV_ENG_REV04.DOCX
Rev. N°00
Date 21/02/2013
This document consists
of 2 pages
NO /
YES /