B.3 Cabinet Installation on Raised Floor
When the B68-22 cabinet is installed in the equipment room with the raised floor, the
H800 series supports are adopted.
Caution:
The feet are insulated. The anchor plate components include insulating units. During
construction, make sure that the insulating units are correctly installed so that the whole
set of equipment is insulated from the ground before the ground wire is connected, thus
effectively meeting the insulation requirement.