H3C S9500 Series Installation Manual
H3C S9500 Series Installation Manual

H3C S9500 Series Installation Manual

Hide thumbs Also See for S9500 Series:

Advertisement

Quick Links

Installation Manual
H3C S9500 Series Routing Switches
Appendix B Installation of B68 Cabinet ......................................................................................B-1
B.1 Installation Overview .........................................................................................................B-1
B.1.1 Precautions .............................................................................................................B-1
B.1.2 Introduction to the Installation.................................................................................B-1
B.2 Cabinet Installation on the Cement Ground ......................................................................B-1
B.2.1 Introduction to Anchor Plate ...................................................................................B-2
B.2.2 Installation Flow ......................................................................................................B-3
B.2.3 Cabinet Positioning.................................................................................................B-3
B.2.4 Cabinet Leveling .....................................................................................................B-6
B.2.5 Cabinet Combination Connection ...........................................................................B-7
B.2.6 Cabinet Fastening...................................................................................................B-9
B.2.7 Insulation Test.......................................................................................................B-11
B.3 Cabinet Installation on Raised Floor ...............................................................................B-13
B.3.1 Introduction to Support and Slide Rail ..................................................................B-14
B.3.2 Installation Flow ....................................................................................................B-16
B.3.3 Support Positioning...............................................................................................B-17
B.3.4 Installation of Support and Slide Rail....................................................................B-20
B.3.5 Installing Supporting Accessories of Raised Floor ...............................................B-25
B.3.6 Cabinet Leveling ...................................................................................................B-26
B.3.7 Cabinet Combination Connection .........................................................................B-27
B.3.8 Cabinet Fastening.................................................................................................B-29
B.3.9 Insulation Test.......................................................................................................B-31
B.3.10 Floor Recovery....................................................................................................B-31
B.4 Quakeproof Reinforcement of Cabinet............................................................................B-33

Table of Contents

i
Table of Contents

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S9500 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for H3C S9500 Series

  • Page 1: Table Of Contents

    Installation Manual H3C S9500 Series Routing Switches Table of Contents Table of Contents Appendix B Installation of B68 Cabinet ..................B-1 B.1 Installation Overview ......................B-1 B.1.1 Precautions ......................B-1 B.1.2 Introduction to the Installation.................B-1 B.2 Cabinet Installation on the Cement Ground ..............B-1 B.2.1 Introduction to Anchor Plate ...................B-2...
  • Page 2: Appendix B Installation Of B68 Cabinet

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Appendix B Installation of B68 Cabinet Note: Except for the height, B68-18 (1.8m in height) cabinet and B68-22 (2.2m in height) cabinet have the same installation requirements in space planning, cabinet positioning, and fixing.
  • Page 3: Introduction To Anchor Plate

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Caution: The feet are insulated. The anchor plate components include insulating units. During construction, make sure that the insulating units are correctly installed so that the whole set of equipment is insulated from the ground before the ground wire is connected, thus effectively meeting the insulation requirement.
  • Page 4: Installation Flow

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet B.2.2 Installation Flow The cabinet installation flow on the cement ground is shown in Figure B-3: Start Start Cabinet positioning Cabinet positioning Cabinet leveling Cabinet leveling Cabinet fastening...
  • Page 5 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) M12 expansion bolt hole mark (2) Cabinet foot location mark (3) Cabinet outline (4) Rear of cabinet (5) Wall or reference body Figure B-4 Installation holes and cabinet foot location marks of a single cabinet...
  • Page 6 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet III. Drilling holes Use a percussion drill with 16 bit to drill holes for the installation of the expansion bolts to fix the anchor plate. When using the percussion drill, be sure to hold the bit perpendicular to the ground.
  • Page 7: Cabinet Leveling

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Expansion tube (2) Guide trough of expansion tube (3) Expansion nut (4) Guide rib of expansion nut Figure B-6 Installation of expansion tube and expansion nut...
  • Page 8: Cabinet Combination Connection

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Retaining nut of the cabinet (2) Cabinet foot (3) Retaining nut of anchor plate (4) Lower enclosure frame of the cabinet Figure B-7 Cabinet feet fastening B.2.5 Cabinet Combination Connection...
  • Page 9 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Upper enclosure frame of the cabinet (2) Combining plate (3) Bolt M6 × 10 (4) Top cover of the cabinet Figure B-8 Removal and installation of the top cover of B68-22 cabinet (1) Nut M8 (2) Flat washer Φ8...
  • Page 10: Cabinet Fastening

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Caution: It is required to remove the top covers before combining cabinets. After combination, top covers are to be installed again. B.2.6 Cabinet Fastening I. Installing anchor plate Install the anchor plate of the B68-22 cabinet according to Figure B-10.
  • Page 11 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Retaining nut of anchor plate (2) Cabinet M16 foot (3) Anchor plate of the B68-22 cabinet Figure B-10 Installation of anchor plate of the B68-22 cabinet II.
  • Page 12: Insulation Test

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Retaining nut of anchor plate (2) Anchor plate of the B68-22 cabinet (3) Cabinet foot (4) Insulating washer of anchor plate (5) Bolt M12 % 70 (6) Spring washer Φ12...
  • Page 13 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet from the earth. In this case, remove all anchor plate parts to check whether the insulating covering or insulating washer is installed or whether the insulating parts are damaged.
  • Page 14: Cabinet Installation On Raised Floor

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Figure B-13 Installation of two cabinets on the cement ground B.3 Cabinet Installation on Raised Floor When the B68-22 cabinet is installed in the equipment room with the raised floor, the H800 series supports are adopted.
  • Page 15: Introduction To Support And Slide Rail

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet B.3.1 Introduction to Support and Slide Rail I. Brief Introduction to Support The support is to raise the cabinet for the convenience of floor paving and cable wiring in the equipment room.
  • Page 16 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Upper support (2) Lower support (3) Ground installation hole (4) Slide rail connection hole (5) Height scale Figure B-15 Appearance of the H800 series supports Installing support components There are four models of H800 series supports, three of which are height-adjustable and the other one is of fixed-height.
  • Page 17: Installation Flow

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet The model IV of the H800 series is a fixed height support, which is suitable for the ultra high and ultra low supports. The suitable lowest floor height of the component is 100mm.
  • Page 18: Support Positioning

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Start Start Support positioning Support positioning Install support Install support Install slide rail Install slide rail Install anti-static floor supporting Install anti-static floor supporting accessories accessories Level cabinet...
  • Page 19 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet installation hole locations of two cabinets and Figure B-21 shows the installation hole locations of multiple cabinets. Figure B-18 Installation hole locations of the H800 series supports...
  • Page 20 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) M12 expansion bolt hole mark (2) Cabinet outline (3) Rear of cabinet (4) Wall or reference body Figure B-20 Installation hole locations of two cabinets (1) M12 expansion bolt hole mark...
  • Page 21: Installation Of Support And Slide Rail

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet III. Drilling holes Use a percussion drill with Φ16 bit to drill holes for the installation of the expansion bolt M12 to anchor the support. When using the percussion drill, be sure to hold the bit perpendicular to the ground.
  • Page 22 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Expansion tube (2) Guide trough of expansion tube (3) Expansion nut (4) Guide rib of expansion nut Figure B-22 Installation of expansion tube and expansion nut...
  • Page 23 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Bolt M12X60 (2) Spring washer Φ12 (3) Big flat washer Φ12 (4) Expansion tube (5) Expansion nut (6) Height-retaining bolt (both sides) (7) Height-retaining bolt (middle)
  • Page 24 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Figure B-24 Appearance of T nut Leveling and fixing slide rail Fix the slide rail on the support with T nut, flat washer, spring washer and bolt M12 × 20.
  • Page 25 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) T nut (2) Spring washer Φ12 (4) Bolt M12 % 20 (3) Flat washer Φ12 (5) Washer (6) Slide rail (7) Shield of slide rail Figure B-25 Fixing and level adjustment of slide rail and support...
  • Page 26: Installing Supporting Accessories Of Raised Floor

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet B.3.5 Installing Supporting Accessories of Raised Floor The supporting accessories of raised floor are to support the raised floor around the cabinet. I. Installing angle plate for the floor bracket and angle supports for slide rails Fix the angle plate and angle supports with bolt, flat washer and spring washer according to installation location, shown in Figure B-27.
  • Page 27: Cabinet Leveling

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Flat washer Φ12 (2) Spring washer Φ12 (3) Bolt M12 % 35 (4) Nut M12 (5) Side floor bracket (6) Angle support of right slide rail...
  • Page 28: Cabinet Combination Connection

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Retaining nut of the cabinet (2) Cabinet foot (3) Retaining nut of anchor plate (4) Lower enclosure frame of the cabinet Figure B-29 Cabinet feet fastening B.3.7 Cabinet Combination Connection...
  • Page 29 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Upper enclosure frame of the cabinet (2) Combining plate (3) Bolt M6 % 10 (4) Top cover of cabinet Figure B-30 Removal and installation of top cover of the B68-22 cabinet (1) Nut M8 (2) Flat washer Φ8...
  • Page 30: Cabinet Fastening

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Caution: It is required to remove the top covers before combining cabinets. After combination, top covers are to be installed again. B.3.8 Cabinet Fastening I. Installing T nuts Before the cabinet is fixed, install the T nuts fixing the cabinet anchor plate into the upper trough of the slide rail.
  • Page 31 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet III. Installing insulating parts and fixing anchor plate First put the insulating washer under the anchor plate (Two insulating washers are required for one anchor plate) and align it with T nut in the upper trough of the slide rail.
  • Page 32: Insulation Test

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet IV. Fastening retaining nut of anchor plate Fasten the retaining nut of the anchor plate on the anchor plate according to part B in Figure B-33, and then fasten the bolt force moment to 45 Nm.
  • Page 33 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Framework of raised floor (2) Side floor bracket Figure B-34 Recovery installation of raised floor B-32...
  • Page 34: Quakeproof Reinforcement Of Cabinet

    Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Figure B-35 B68-22 cabinet installation in the equipment room with raised floor B.4 Quakeproof Reinforcement of Cabinet Note: For the areas subject to earthquake risk, in order to improve the quakeproof performance of the cabinet, reinforcement measures should be followed for the cabinet according to the following procedures.
  • Page 35 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet II. Installing quakeproof lever Connect the angle connector and channel beam with the quakeproof angle plate or the ceiling of the equipment room according to Figure B-38. Figure B-39 shows the quakeproof reinforcement for multiple cabinets.
  • Page 36 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (1) Quakeproof angle plate Figure B-37 Position of quakeproof angle plate after reinforcement B-35...
  • Page 37 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet (2) Expansion bolt M8 × 80 (1) Insulating plate (3) Angle connector (4) Insulating covering (5) Big washer Φ8 (6) Nut M8 (8) Bolt M8 % 20...
  • Page 38 Installation Manual H3C S9500 Series Routing Switches Appendix B Installation of B68 Cabinet Figure B-39 Quakeproof reinforcement for multiple cabinets B-37...

Table of Contents