H3C S6805 Series Installation Manual page 20

Hide thumbs Also See for S6805 Series:
Table of Contents

Advertisement

Figure2-17 Attaching the mounting brackets and chassis rails to an S6805-54HF (mounting
brackets installed near the power supply side, rack mounting rail kit B, wide-spacing
installation)
Figure2-18 Attaching the mounting brackets and chassis rails to an S6805-54HT (mounting
brackets installed near the port side, rack mounting rail kit A or C)
Figure2-19 Attaching the mounting brackets and chassis rails to an S6805-54HT switch
(mounting brackets installed near the power supply side, rack mounting rail kit A or C)
Connecting the grounding cable to the chassis
IMPORTANT:
The primary and auxiliary grounding points are located on the left side panel of the chassis. The two
grounding points might be not reachable after the switch is mounted in the rack. Connect the
grounding cable to a grounding point before you mount the switch in the rack.
2-9

Advertisement

Table of Contents
loading

Table of Contents