Mount the switch in the rack (two options) 安装交换机到机柜(二选一) Connect the grounding cable to the grounding point on the chassis side before installing the switch in the rack. 为了防止机箱安装到机柜后无法安装接地线,请您先将接地线安装到交换机的侧面接地点上。 The switch provides a grounding sign and grounding screws at the primary grounding point, but Power module side mounting does not provide them at the auxiliary grounding point.
Page 3
Airflow through the switch 交换机的风向设计 The switch provides front-to-back and back-to-front air aisles. Select fan trays to provide airflow from the power module side to the port side, or from the port side to the power module side based on the ventilation requirements at the installation site. 交换机采用前后风道设计,通过安装不同的风扇模块,可提供“电源侧到端口侧”和“端口侧到电源侧”...