Pre-Routing Cni To 3Pe Cables - Nortel MER-1002-003 Manual

Add a network group to option 81c cp2-4 with fnf
Table of Contents

Advertisement

Documentation Release Note

Pre-routing CNI to 3PE cables

Nortel Networks
5
Verify the status of the CNI cards:
STAT CNI
—————————— End of Procedure ——————————
The CNI backplane ports are connected to the 3PE cards with two NTND14
CNI to 3PE cables per port. The third port connects from the CNI-3 faceplate
to the 3PE card with two NT9D89 cables.
When a CNI card is upgraded to a CNI-3 card, the original NTND14
backplane cables are left in place; only the NT9D89 CNI-3 to 3PE faceplate
cables must be added.
Procedure 4
Pre-routing CNI to 3PE cables
1
Label the cables with Network Group, CNI port and connection
information.
2
Route the new CNI to 3PE cables according to the port assignments in
Tables 1, Table 2 and Table 3. Do NOT attach the cables.
—————————— End of Procedure ——————————
to check the status of the cards and ports.
11/4/02
Number: MER-1002-003
5 of 26
TM

Advertisement

Table of Contents
loading

Table of Contents