Hide thumbs Also See for 6 Series:

Advertisement

Thank you for choosing Merlyn. Please familiarise yoursel
with the fitting instructions before commencing fitting.
1. Check that you have the tools required.
. Check
2
that the installation site is compatible
with size of door supplied
3. Check all the enclosure components.
. Check
4
that the installation kit is complete
Any parts missing or damaged must be reported to your supplier within 5 days of purchase.
Inspect shower enclosure before fitting. No claims will be acceptable after product has been installed.

INSTALLATION GUIDE

OFFSET QUADRANT
IMPORTANT
.
f
DO NOT
attempt to install the product unless you can
tick ALL
4 boxes as satisfactory.
The wall plugs supplied with the installation kit are for
use in solid walls. Hollow or ' s tud-partition' walls will
require
alternative fixings. Please consult a hardware
supplier for the correct type.
It may also be necessary to consult your tiling supplier
about the correct method for drilling your tiles.
USE SAFETY EYEWEAR WHEN DRILLING
VIVID
10
M037-00

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MERLYN 6 Series

  • Page 1 INSTALLATION GUIDE VIVID OFFSET QUADRANT IMPORTANT Thank you for choosing Merlyn. Please familiarise yoursel DO NOT attempt to install the product unless you can with the fitting instructions before commencing fitting. tick ALL 4 boxes as satisfactory. The wall plugs supplied with the installation kit are for 1.
  • Page 2 COMPONENTS AND BOX CONTENTS Description Part No. Description Part No. V2101L/ R Moving panel Cover cap for upright profile V2104 Cover cap for wall profile Rail ∅ 6 30 wall plug × Bottom roller S6LL8060 V6113 Screw cover cap clip V2114 Upright water seal for moving panel S6LC83291871...
  • Page 3 FIXING KIT COMPONENTS, TOOLS REQUIRED, SITE V2101L V2101R V2104 × × ×2 × S6HDLEP1 S6LL8059 S6LL8060 × S6HDLEP2 × × × S6HDLEP3 × S6HDLEP4 V2115 V6113 V2114 × S6HDLEP5 × ×6 × × S6HDLEP6 S6HDLE V4110 V6115 V4111 × × S6HDLEP7 ×...
  • Page 4 FITTING WALL PROFILE PROCEDURE TRAY MUST BE 100% LEVEL IN ALL DIRECTIONS Ensure the shower tray is level in all directions and is properly sealed to the wall. The wall must be tiled down to the top edge of the tray. Do not angle out bottom tile. level 100 %...
  • Page 5 FITTING RAILS Step 3. Loosen fixed glass panel clips. Do not remove the screw. V4111 V3211 U shape seal (flush with glass edge) V3211 U shape seal (flush with glass edge) Step 5. Fit the wall profiles to the assembled frame.
  • Page 6 FITTING DOOR PANELS AND ROLLERS Step 7 Position the assembled frame onto the tray and slide over the wall profile. NOTE: In a situation where you are close to the minimum adjustment, fit only 1 wall profile to the wall and put the second wall profile into the frame, position the frame onto the tray and then fix the second wall profile to the wall.
  • Page 7 FINISHING Step 10. Hang the moving panel to the top rail, then push the bottom rollers into the bottom rail. NOTE: Ensure handle is towards flat fixed panel. Top rail Top roller S6HDLEP1 S6HDLEP3 S6HDLEP4 S6HDLEP5 push S6HDLEP6 down S6HDLEP7 S6HDLEP2 Outside Bottom...
  • Page 8 SEALING AND TROUBLE SHOOTING Step 16. Use a quality silicone sealant and applicator gun to seal the finished door. SEALING INSIDE Seal top to bottom on the INSIDE between the wall profile and the wall. Note: Do not apply sealant on the inside of the tray.

This manual is also suitable for:

Offset quadrant

Table of Contents