Outdoor Construction - Mitsubishi Electric VL-50S2-E Installation Manual

Hide thumbs Also See for VL-50S2-E:
Table of Contents

Advertisement

2. Fit in the panel horizontally and push.
Panel

5.6 Outdoor construction

1. Fill the wall hole.
caulking.
Note
to enter.
condensation.
2. Attach the weather cover.
and remove the hood part.
because they are used later when attaching
the hood.
supply/exhaust pipe so that the "
comes to the top.
pipe
mounting plates
" mark
ウエ
Eng-11
the hood mounting plate to the wall.
φ
hole.
secure the plate.
"
" mark
ウエ
Partition
plate
(Knockout hole)
and the wall using commercially available
caulking compound to prevent rainwater
secure the hood part.
mounting plates
Hood part
Note
Attach the hood part to the hood mounting
plate and check that the hooking part at
the top of the hood mounting plate and the
hooking hole on top of the hood part match.
Attach the hood part so that the seal comes
to the lower side.
mounting
screws
mounting plates
Hooking part
Hooking hole
Partition plate
screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl-50es2-e

Table of Contents