Installation; Levelling The Dryer; Downtime After Installation; Ventilation - Miele TWJ 660 WP Operating Instructions Manual

Heat pump dryer
Hide thumbs Also See for TWJ 660 WP:
Table of Contents

Advertisement

Installation

Levelling the dryer

Ensure that no closeable door, slid-
ing door, or an oppositely hinged
door is installed that would hinder
the door of the dryer being opened in
any way.
The dryer must stand perfectly level to
ensure safe and proper operation.
The screw feet can be adjusted to com-
pensate for unevenness in the floor.

Downtime after installation

Damage to the tumble dryer by
switching it on too soon.
This can damage the heat pump.
After setting up the tumble dryer wait
for at least one hour before switching
it on.

Ventilation

The cool air intake at the front of the
tumble dryer must not be blocked or
covered. This would hinder a suffi-
cient intake of cool air for the heat
exchanger.
Do not block the gap between the
bottom of the tumble dryer and the
floor with plinth facings, deep pile
carpet etc. This would hinder a suffi-
cient flow of air to the tumble dryer.
The hot air that is blown out from the
heat exchanger warms the room air. En-
sure sufficient ventilation of the room:
e.g., open the window. The drying time
will otherwise take longer (higher energy
requirement).
Before moving the tumble dryer
again (e.g. when moving house)
After each use a small quantity of con-
densed water will collect in the area of
the pump. This water can run out if the
tumble dryer is tipped up when it is be-
ing moved. Recommendation: run the
Warm air programme for approximately
1 minute before moving the tumble
dryer. Any remaining condensed water
will then be fed into the condensed wa-
ter container or out through the drain
hose.
Installation
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents