Commissioning, inspection, maintenance
Commissioning the system
Required parameters for components connected on site
Parameters may need to be set subject to the type of
appliance, the selected system scheme and the acces-
sories used.
Overview of required parameters: see the following
chapter.
System scheme
Overview of all possible system schemes
Component
Heating circuit
A1/HC1
M2/HC2
DHW cylinder
Heating water buffer cylinder
Instantaneous heating water heater
Swimming pool
Solar thermal system (with integral solar control function)
Cooling
A1/HC1
M2/HC2
Separate cooling circuit
SKK
Ice store system
Electricity meter, 3-phase
Ventilation unit
X Component is selected.
Component may be added.
0
46
(cont.)
System scheme
0
1
X
—
—
—
X
—
—
0
X
X
—
0
—
0
—
0
—
—
0
0
0
0
0
0
0
0
Detailed explanations of parameters
"Vitotronic 200" service instructions
2
3
4
X
—
—
X
X
—
X
X
—
X
X
0
X
X
X
0
0
0
—
0
0
—
—
0
—
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
6
11
X
X
—
X
X
—
X
—
—
X
X
—
X
X
—
—
0
0
—
—
0
—
0
0
—
0
0
—
0
0
0
0
0
0
0
0
0
0
0