Gas sampling probe H: Replacing membrane pump membranes
Maintenance interval
Safety
measures
Tools required
Requirements
Instructions
OI/SCK-EN Rev. E
twice yearly
Always take the following safety measures when performing this work:
Wear the general protective equipment.
Turn the service switch to
authorized switching (with a padlock).
Additionally press the EMERGENCY STOP switch.
Do not enter the danger area around the retractor until it is at standstill
and the warning lamps and buzzer are off and the flap valve is closed.
Do not perform the work until the gas sampling system has cooled
down.
Explanation of safety measures:
page 158.
Control cabinet key to open the control cabinet
The following conditions must be met:
The service switch is in the
ed from the kiln (see
The EMERGENCY STOP switch is pressed.
Perform the following steps to replace the structural diaphragm of the pre-
-M71
suction pump
:
Step
1
Open the control cabinet.
2
Power off pump at the circuit breaker
3
Clean outside of pump housing.
4
Unscrew the four screws to open the pump housing.
5
Detach the pump tubes, remove the pump
externally.
Operating instruction SCK Gas Sampling System
ON
and secure the service switch against un-
Safety regulations for maintenance work on
ON
position, the gas sampling probe is retract-
Operating the service switch
Procedure
on page 161).
-F34
.
-M71
and clean it