Installing The Cooling Module - ABB SCK Operating Instructions Manual

Sampling system for dry gas sampling at rotary cement kiln gas exit and calciner gas exit
Hide thumbs Also See for SCK:
Table of Contents

Advertisement

Installing the cooling module

Mechanical, thermal
and material dangers
Heavy transport
units
Screws required for
assembly
Requirements
Instructions
OI/SCK-EN Rev. E
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
 Closed overalls with long trousers and long sleeves
 Safety shoes
 Safety gloves suitable for mechanical work
 Safety glasses
 Protective helmet
 If necessary, additional protective equipment if prescribed by the opera-
tor.
Danger of crushing when lifting or lowering the transport unit
 Only appropriately trained personnel may transport the transport units and
only with the aid of the recommended transport equipment.
 Do not stand under suspended loads.
 Follow the transport instructions in these operating instructions care-
fully.
 4 galvanized steel screws (or stainless material) M12x30 or bolts M12x30
The following requirements must be met in order to install the cooling mod-
ule:
 The site conforms to the designated site conditions (criteria see
the place of installation of the peripheral modules
 Fastening points are present to affix the cooling module.
 The cooling module is unpacked.
How to install the cooling module:
Step
1
Fasten cooling module in suitable position (see
ing the place of installation of the cooling module
4 assembly screws or bolts on the ground.
2
Attach suitable drain pipe to safety valve outlet
order to prevent danger of cooling water escaping.
Operating instruction SCK Gas Sampling System
).
Procedure
Choosing
Choos-
) with
-J62
in
103

Advertisement

Table of Contents
loading

Table of Contents