Sign In
Upload
Manuals
Brands
ABB Manuals
Industrial Equipment
SCK
User Manuals: ABB SCK Gas Sampling System
Manuals and User Guides for ABB SCK Gas Sampling System. We have
2
ABB SCK Gas Sampling System manuals available for free PDF download: Operating Instructions Manual, System Manual
ABB SCK Operating Instructions Manual (244 pages)
Sampling system for dry gas sampling at rotary cement kiln gas exit and calciner gas exit
Brand:
ABB
| Category:
Industrial Equipment
| Size: 9 MB
Table of Contents
Table of Contents
2
Chapter 1 General
5
About These Operating Instructions
6
Safety Instructions in this Document
8
System Identification
10
Service
13
Chapter 2 Description of the Sampling System
15
Technical Data
16
Intended Conditions of Use
17
Structure and Function
18
Mode of Functioning and Operating Modes
19
Process Monitoring
20
Controls and Displays
22
Probe Retractor
24
Gas Sampling Probe H
26
Gas Sampling Probe 60S
28
Cooling Module
30
Transformer
32
Compressed-Air Tank and Pneumatic System
33
Chapter 3 Description of Control System
35
Structure and Function of the Control System
36
User Interface: Operation Screen
38
User Interface: Trend Screen
40
User Interface: Message Screen
42
User Interface: Parameter Screen
44
Error Message Display
45
Error Message Display
46
Access Permissions
47
Default Operating Parameter Settings
48
Optimizing Operating Parameters
51
Chapter 4 Safety
53
Basic Safety Rules
54
Overview of Dangers
57
Protective Installations
59
Warning Signs on the System
63
Requirements to be Met by Personnel, Work Places
65
Personal Safety Equipment
67
Safety Measures: Transport and Unpacking
68
Safety Measures: Installation
69
Safety Measures: Start-Up
72
Safety Measures: Operation
76
Safety Measures: Maintenance and Troubleshooting
80
Chapter 5 Transport and Unpacking
85
General Transport Information
86
Transport the System in the Company
89
Unpacking the System
91
Scope of Delivery
92
Chapter 6 Installation
93
Overview: Installation
94
Checking Site Conditions
95
Installing the Probe Retractor
97
Installing the Control Cabinet
100
Installing the Compressed-Air Supply
101
Installing the Cooling Module
103
Installing the Cooling Water Circuit
104
Connecting the Sample Gas Line to the Retractor
105
Connecting Internal Electric Cables
106
Connecting External Electric Cables
108
Chapter 7 Start-Up
111
Overview: Start-Up
112
Installation Check
113
Preparing the Cooling-Water Circuit
114
Preparing the Compressed-Air Supply
116
Activation
118
After Switching On: Working on the Cooling Module
121
Checking the Pneumatic System
123
Starting Frequency Converter and Adapting Control Parameters
124
Checking/Correcting Operating Parameters
126
Checks to Perform When Using Probe H
127
Inserting the Probe and Switching to Automatic Mode
130
Chapter 8 Operation
135
Safety Regulations for Operation
136
Monitoring Automatic Mode
139
Checking General Condition
141
Cleaning Gas Sampling Probe H
143
Cleaning Gas Sampling Probe 60S
145
Using the EMERGENCY-STOP Switch
147
Chapter 9 Maintenance
149
Maintenance Plan
150
Equipment Layout Plan
154
Acquiring Spare Parts and Wear Parts
157
Safety Regulations for Maintenance Work
158
Operating the Service Switch
161
Checking the Condition of the System, Cleaning the System
163
Evaluating Trend Displays
166
Checking the Residual Current Circuit Breaker
167
Checking Protective Installations
169
Checking for Leaks
173
Gas Sampling Probe H: Removing Incrustations
176
Gas Sampling Probe H: Replacing the Intake Filter
178
Gas Sampling Probe H: Replacing Membrane Pump Membranes
181
Gas Sampling Probe 60S: Removing Incrustations
184
Gas Sampling Probe 60S: Cleaning or Replacing the Outlet Filter
186
Gas Sampling Probe 60S: Replacing the Seal Set
189
Probe Retractor: Checking Filter/Pressure Control Combination
191
Probe Retractor: Checking and Replacing the Filter Muffler
193
Probe Retractor: Checking and Topping up the Oiler
195
Probe Retractor: Checking and Tightening the Drive Chain
198
Probe Retractor: Checking And, if Necessary, Adjusting the Position of the Probe
200
Probe Retractor: Checking And, if Necessary, Adjusting the Position Indicator (Probe End Position)
204
Probe Retractor: Checking the Bellows
207
Cooling Module: Vent the Cooling-Water Circuit
208
Cooling Module: Checking and Topping up Cooling Water
210
Pneumatic System: Replacing the Compressed-Air Filter
213
Chapter 10 Errors
215
Errors and Irregularities
216
Touchscreen Error Displays
218
Handling Error Messages
223
Chapter 11 Shutting Down, Storing, Putting Back into Operation, Disposal
225
Shutting down the System
226
Disassembling the System
229
Storing the System
232
Putting the System Back into Operation
233
Disposing of the System
234
Chapter 12 Appendix
235
Pneumatic/Hydraulic Interface Plan
236
Electrical Connection Plan
238
Transformer Connection Plan
240
Index
241
Advertisement
ABB SCK System Manual (244 pages)
Sampling system for dry gas sampling at rotary cement kiln gas exit and calciner gas exit
Brand:
ABB
| Category:
Industrial Equipment
| Size: 13 MB
Table of Contents
Table of Contents
4
Chapter 1 General
7
About These Operating Instructions
8
Safety Instructions in this Document
10
System Identification
12
Service
15
Chapter 2 Description of the Sampling System
17
Technical Data
18
Intended Conditions of Use
19
Structure and Function
20
Mode of Functioning and Operating Modes
21
Process Monitoring
22
Controls and Displays
24
Probe Retractor
26
Gas Sampling Probe H
28
Gas Sampling Probe 60S
30
Cooling Module
32
Transformer
34
Compressed-Air Tank and Pneumatic System
35
Chapter 3 Description of Control System
37
Structure and Function of the Control System
38
User Interface: Operation Screen
40
User Interface: Trend Screen
42
User Interface: Message Screen
44
User Interface: Parameter Screen
46
Error Message Display
48
Access Permissions
49
Default Operating Parameter Settings
50
Optimizing Operating Parameters
53
Chapter 4 Safety
55
Basic Safety Rules
56
Overview of Dangers
58
Protective Installations
60
Warning Signs on the System
63
Requirements to be Met by Personnel, Work Places
65
Personal Safety Equipment
67
Safety Measures: Transport and Unpacking
68
Safety Measures: Installation
69
Safety Measures: Start-Up
72
Safety Measures: Operation
75
Safety Measures: Maintenance and Troubleshooting
78
Chapter 5 Transport and Unpacking
83
General Transport Information
84
Transport the System in the Company
87
Unpacking the System
89
Scope of Delivery
90
Chapter 6 Installation
91
Overview: Installation
92
Checking Site Conditions
93
Installing the Probe Retractor
95
Installing the Control Cabinet
98
Installing the Compressed-Air Supply
99
Installing the Cooling Module
101
Installing the Cooling Water Circuit
103
Connecting the Sample Gas Line to the Retractor
104
Connecting Internal Electric Cables
105
Connecting External Electric Cables
107
Chapter 7 Start-Up
111
Overview: Start-Up
112
Installation Check
113
Preparing the Cooling-Water Circuit
114
Preparing the Compressed-Air Supply
116
Activation
118
After Switching On: Working on the Cooling Module
121
Checking the Pneumatic System
123
Starting Frequency Converter and Adapting Control Parameters
124
Checking/Correcting Operating Parameters
127
Checks to Perform When Using Probe H
128
Inserting the Probe and Switching to Automatic Mode
131
Chapter 8 Operation
135
Safety Regulations for Operation
136
Monitoring Automatic Mode
138
Checking General Condition
140
Cleaning Gas Sampling Probe H
142
Cleaning Gas Sampling Probe 60S
144
Using the EMERGENCY-STOP Switch
146
Chapter 9 Maintenance
147
Maintenance Plan
148
Equipment Layout Plan
152
Acquiring Spare Parts and Wear Parts
155
Safety Regulations for Maintenance Work
156
Operating the Service Switch
159
Checking the Condition of the System, Cleaning the System
161
Evaluating Trend Displays
164
Checking the Residual Current Circuit Breaker
165
Checking Protective Installations
167
Checking for Leaks
171
Gas Sampling Probe H: Removing Incrustations
174
Gas Sampling Probe H: Replacing the Intake Filter
176
Gas Sampling Probe H: Replacing Membrane Pump Membranes
179
Gas Sampling Probe 60S: Removing Incrustations
182
Gas Sampling Probe 60S: Cleaning or Replacing the Outlet Filter
184
Gas Sampling Probe 60S: Replacing the Seal Set
187
Probe Retractor: Checking Filter/Pressure Control Combination
189
Probe Retractor: Checking and Replacing the Filter Muffler
191
Probe Retractor: Checking and Topping up the Oiler
193
Probe Retractor: Checking and Tightening the Drive Chain
196
Probe Retractor: Checking And, if Necessary, Adjusting the Position of the Probe
198
Probe Retractor: Checking And, if Necessary, Adjusting the Position Indicator (Probe End Position)
202
Probe Retractor: Checking the Bellows
205
Cooling Module: Vent the Cooling-Water Circuit
206
Cooling Module: Checking and Topping up Cooling Water
208
Pneumatic System: Replacing the Compressed-Air Filter
211
Chapter 10 Errors
213
Errors and Irregularities
214
Touchscreen Error Displays
216
Handling Error Messages
221
Chapter 11 Shutting Down, Storing, Putting Back into Operation, Disposal
223
Shutting down the System
224
Disassembling the System
227
Storing the System
229
Putting the System Back into Operation
230
Disposing of the System
231
Chapter 12 Appendix
233
Pneumatic/Hydraulic Interface Plan
234
Electrical Connection Plan
236
Transformer Connection Plan
238
Index
239
Advertisement
Related Products
ABB SCC-S
ABB SCC-F
ABB SafeLink
ABB Relion SMU615
ABB SmartRack MV
ABB Spot 35 T
ABB Spot 10 T
ABB SafeRing XT
ABB SPAJ 110 C
ABB SAM600-IO IEC
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL