Warmington SG 600 Installation Instructions Manual page 28

Table of Contents

Advertisement

PROCEDURE FOR THE TEST AND COMISSIONING OF YOUR DECORATIVE FIRE
Ensure Gas Supply and the Power Supply (caution 240V) to the Unit
Refer to Data Plate on this specification for settings. The Data plate is attached to the under carriage of
the Burner.
Remove front grate.
Loosen the Jet test point and attach manometer (digital is preferred). The test point is on the right hand
side of the gas burner, as shown below:
Light appliance, adjust to high flame setting and check pressure, adjust to low flame and check pressure.
NOTE:
Any alterations to pressure is to be carried out by a Certified Gasfitter
If adjustments are necessary, remove the cap. The Pressure Adjustment screw and nut are on the front
side of the Gas Control Valve (shown in diagram B in this specification) and are factory set.
High Pressure Setting: Set the modulator to maximum condition. Screw in Nut A to increase the outlet pres-
sure then screw nut A out to decrease the pressure to the desired settings. Use 10mm spanner.
Low Pressure Setting: Turn off the power to the modulator (by disconnecting the modulator harness connec-
tion at the valve - see wiring) and keep nut A stationary. Use a screwdriver to screw in Screw B to increase the
pressure and screw it out to decrease the pressure. Carefully replace the modulator plastic cap.
WARNING: To ensure the correct operation of the modulator it is necessary that the plastic cap is returned to
its original location.
28
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm.............Copyright ©
7 October 2021
Gas Test Nipples
for SG / EG Fires

Advertisement

Table of Contents
loading

Table of Contents