INSTALLATION PROCEDURE
Refer to Installation Drawing for clarification. Check parts list to ensure all required
parts are included. Use an AS 4020 approved pipe joint sealant on all connections.
STEP 1: Prepare the emergency shower foundation by using the floor flange as a
template. Locate the three holes for the 3/8-16 UNC x 6" anchor bolts.
(Not supplied). They should extend 1" above the floor level.
STEP 2: Once the concrete foundation is ready (dry), assemble the floor flange to
the anchor bolts; then securely fasten with 3/8-16 UNC Hex nuts and 3/8"
washers (Not supplied). Seal and tighten floor flange and (1-1/4") tee
making certain the waste tee is facing the proper location and the foot
control holes are facing side to side.
STEP 3: Assemble nipple (1-1/4" x 24") to the tee and tighten with a pipe wrench.
STEP 4: Assemble the eye/face wash loop assembly to the (24") nipple from Step
three. Connect the pipe wrench to the nipple between the two tees to
avoid damage.
STEP 5: Assemble in the following order:
Attach nipple (1-1/4" x 24") onto the loop assembly.
Attach nipple (1-1/4" x 24") onto the tee.
Attach tee (1-1/4" x 1-1/4" x 1") onto nipple.
Attach nipple (1" x 8") and valve assembly onto tee.
Attach street elbow (1") and nipple (1" x 12-1/2") onto valve.
STEP 6: Assemble showerhead onto street elbow (1").
STEP 7: Assemble the sign onto the unit. Use the strap, screws, washers and
nuts provided to mount the sign onto the upright. The sign should be
positioned for maximum visibility.
STEP 8: Insert the plug into the optional supply line tee that is not used. Before
connecting the supply water line to the emergency shower; CHECK IF
THE ASSEMBLY IS RIGIDLY TIGHTENED AND FLUSH THE LINE
THOROUGHLY.
th
Version 3.1, 13
Aug. 2021, Page 3 of 7