Download Print this page

Pre-Installation; Mounting Details - Galvin Engineering TCWBC150C Product Installation

Cp-bs hospital wall bath set taps w/ 180 outlet lamina

Advertisement

Product Installation Guidelines

PRE-INSTALLATION -

Wall body
Wall body must be G5/8" FI and body
should be between 0 and 15mm
behind the finished wall surface.
© Galvin Engineering Pty Ltd

MOUNTING DETAILS

TCWBC80C/TCWBJ80C
TCWBC150C/TCWBJ150C
Wall spud
Wall spud must be ½" BSP MI and protrude
-
from the finished wall by no more than 15mm
Note: In some situations, a male thread
connection on the tap may be more suited. If so,
please contact us on 1300 514 074
Note: Before installation, all lines must be flushed. We
recommend that a line strainer be installed prior to taps
to eliminate any foreign material.
Document No.: 001.00.10.05
Version 1, 7 April 2022, Page 2 of 5

Advertisement

loading

This manual is also suitable for:

Tcwbj150cTcwbc80cTcwbj80c