PRE - INSTALLATION

LOCATION OF UNIT: The Model 190.82.11.90 (7777-A) Stainless Steel combination
Shower Eye/Face Wash should be installed in close proximity to potential accident
areas. It should be clearly identified, free from obstructions and easy to access.
SUPPLY LINE: The minimum recommended line size is 1/2" BSPT with 210 – 600 kPa
flowing pressure. Where sediment or mineral content is a problem, an inlet filter is
recommended.
PLUMBING CONNECTIONS: Inlet supply is female 1/2" BSPT. Waste outlet is male 1-
1/4" BSPT.
Pedestal Floor Mtd, Axion
th
Version 4.1, 13
Aug. 2021, Page 1 of 7
®
MSR Eye/Face

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GalvinSafe 190.82.11.90 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Galvin Engineering GalvinSafe 190.82.11.90

  • Page 1 Pedestal Floor Mtd, Axion MSR Eye/Face Wash Head, S/S Bowl, Hand & Foot Act, (HAWS) PRODUCT CODE: Galvin Engineering: 190.82.11.90 HAWS: 7777-A + SP220SS PRE - INSTALLATION LOCATION OF UNIT: The Model 190.82.11.90 (7777-A) Stainless Steel combination Shower Eye/Face Wash should be installed in close proximity to potential accident areas.
  • Page 2 EMERGENCY EYE SAFETY 190.91.12.32 SIGN 190.92.41.30 VALVE ASSEMBLY 190.91.22.12 FOOT TREADLE 190.92.12.10 EYE/FACE WASH ASSEMBLY 190.91.80.33 TEST TAG L-STRAINER* SS DUST COVER ASSEMBLY* (OPTIONAL) * spare parts will require special order or may not be available (contact Galvin engineering for more details).
  • Page 3 Version 4.1, 13 Aug. 2021, Page 3 of 7...
  • Page 4 Version 4.1, 13 Aug. 2021, Page 4 of 7...
  • Page 5 Version 4.1, 13 Aug. 2021, Page 5 of 7 TROUBLESHOOTING PROBLEM REPAIR CHECKLIST 1. No Flow. Check the main shut-off valve. 2. Insufficient water flow 2. a. Verify minimum 210 kPa flowing supply line pressure. b. Probable clogging of flow control due to inadequate line flushing.
  • Page 6 Version 4.1, 13 Aug. 2021, Page 6 of 7...
  • Page 7 Aug. 2021, Page 7 of 7 WARRANTY The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, express or implied.

This manual is also suitable for:

Haws 7777-aHaws sp220ss

Table of Contents