Download Print this page

Inverter Function Setting - Mitsubishi Electric A800-E Instruction Manual

Hide thumbs Also See for A800-E:

Advertisement

5

INVERTER FUNCTION SETTING

5.1
Operation panel (FR-LU08)
The operation panel can be used for setting the inverter parameters, monitoring various items, and checking fault indications.
 Removal and installation of the accessory cover
• Loosen the two fixing screws on the accessory cover.
(These screws cannot be removed.)
• To install the accessory cover, fit it securely and tighten the screws. (Tightening torque: 0.40 to 0.45 Nm)
 Installing the operation panel on the enclosure surface
• Having an operation panel on the enclosure surface is convenient. With a connection cable, you can install the operation panel to the enclosure surface, and
connect it to the inverter.
Use the option FR-CB2[ ], or connectors and cables available on the market. (To install the operation panel, the optional connector (FR-ADP) is required.)
Securely insert one end of the connection cable until the stoppers are fixed.
NOTE
• Refer to the following table when fabricating the cable on the user side. Keep the total cable length within 20 m.
Name
Communication cable
• For the details of the FR-LU08, refer to the FR-LU08 Instruction Manual.
Loosen
Loosen
Operation panel connection cable
(FR-CB2[ ]) (option)
Operation panel (FR-LU08)
Operation panel connection connector
(FR-ADP) (option)
Cable compliant with EIA-568 (such as 10BASE-T cable)
• Push the upper edge of the accessory cover and pull the accessory cover to
remove.
Remarks
INVERTER FUNCTION SETTING
Operation panel (FR-LU08)
11

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Fr-a860-eFr-a860-00027-00450-e-n6Fr-a860-00680-04420-e