Securing The Burner To The Boiler - Riello RRS 68/E O2 BLU Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

5.7

Securing the burner to the boiler

Provide an adequate lifting system of the burner.
Separate the combustion head from the rest of the burner, as in
Fig. 16; proceed as follows:
 loosen the 4 screws 3) and remove the hood 1);
 disconnect the socket from the maximum gas pressure
switch;
 remove the two screws 4);
 pull back the burner on the guides 5) by about 100 mm;
 remove the screws 2) from the two guides 5);
 disconnect the probe and electrode leads, then unthread the
burner completely from the guides.
20169327
Installation
Once this operation has been carried out:
 fix the flange 9) to the boiler plate, interposing the insulating
 Use the 4 screws supplied, with a tightening torque of 35 -
1
2
5
20113660
22
GB
Before fixing the burner to the boiler, check for the
model RS 120/E O
included in area A or B of the firing rate (Fig. 2 at
page 9).
WARNING
If it is in area A, no intervention is required.
If it is in area B, it is necessary to pre-calibrate the
combustion head, as described in the paragraph
"Pre-calibrating the combustion head" on
page 23.
gasket 8) supplied.
40 Nm, after protecting their thread with anti-seize products.
The seal between burner and boiler must be air-
tight; after the start-up, check there is no leakage
of flue gases into the external environment.
WARNING
9
13
3
BLU, if its maximum output is
2
12
11
10
L
8
13
3
4
Fig. 16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs 120/e o2 blu20174458201744632016599620174465

Table of Contents