Electric Heating Sequence Of Operations; Electric Heat Operating Errors - York International ZQ Series Installation Manual

Table of Contents

Advertisement

operation of a compressor too soon after its
previous run. Additionally, a minimum run time is
imposed any time a compressor is energized.
The ASCD is initiated on unit start-up and on any
compressor reset or lock-out.
Flash Codes or Error Messages
The UCB will initiate a flash code on the ETC, or
send an error message to the LCD Display on Smart
Equipment™ associated with errors within the
system.
Reset
Remove the call for cooling, by raising thermostat
setting higher than the conditioned space
temperature. This resets any pressure or freezestat
lockouts.
Electric Heating Sequence of
Operations
The following sequence describes the operation of
the electric heat section.
Single-stage heating (applies only to 5 KW, 7 kW,
and 10 kW 230V heaters and to 7 kW, 10 kW, and 15
kW 460V and 575V heaters. All other heaters MUST
use a two-stage thermostat):
a. Upon a call for heat by the thermostat, the heater
sequencer (1S) will be energized. After completing
the specified fan on delay for heating, the UCB will
energize the blower motor.
b. The thermostat will cycle the electric heat to
satisfy the heating requirements of the conditioned
space.
Two-stage heating (applies only to 15 kW, 20 kW and
30 kW 230V heaters and 20 kW and 30 kW heater
460V and 575V heaters.):
a. Upon a call for first-stage heat by the thermostat,
the heater sequencer (1S) (15 kW, 20 kW, 30 kW
230 volt) and contactor (2M) (20 kW, 30 kW 460
and 575 volt) will be energized. After completing
the specified fan on delay for heating, the UCB will
energize the blower motor.
If the second stage of heat is required, heater
sequencer (2S) (12 kW, 20 kW, 30 kW 230 volt) or
contactor (3M) (20 kW, 30 kW 460 and 575 volt) will
be energized. After completing the specified fan on
delay for heating, the UCB will energize the blower
motor.
b. The thermostat will cycle the electric heat to
satisfy the heating requirements of the conditioned
space.

Electric Heat Operating Errors

Temperature Limit
If the UCB senses zero volts from the high
temperature limit, the indoor blower motor is
immediately energized.
This limit is monitored regardless of unit operation
status, i.e. the limit is monitored at all times.
If the temperature limit opens three times within
one hour, the UCB will lock-on the indoor blower
motor and will initiate a flash code on the ETC, or
send an error message to the LCD Display on Smart
Equipment™.
Safety Controls
The UCB monitors the temperature limit switch of
electric heat units.
The control circuit includes the following safety
controls:
Temperature Limit Switch (TLS)
This control is located inside the heater
compartment and is set to open at the temperature
indicated in the Electric Heat Limit Setting Table 21.
It resets automatically. The limit switch operates
when a high temperature condition, caused by
inadequate supply air flow occurs, thus shutting
down the heater and energizing the blower.
Flash Codes or Error Messages
The UCB will initiate a flash code on the ETC, or
send an error message to the LCD Display on Smart
Equipment™ associated with errors within the
system.
Reset
Remove the call for heating by lowering the
thermostat setting lower than the conditioned space
temperature. This resets any flash codes.
Electric Heat Anticipator Setpoints
It is important that the anticipator setpoint be
correct. Too high of a setting will result in longer
heat cycles and a greater temperature swing in the
conditioned space. Reducing the value below the
INSTALLATION MANUAL ZQ SERIES 3 - 5 ton 60 Hertz R-410A
Johnson Controls Ducted Systems
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

ZqeZqg

Table of Contents