X7-8-Install-IG100 Installation Guide
Introduction
About This Document
This hardware installation guide contains procedures and safety requirements for installing the Brocade X7-8 Director into
a rack system or as a stand-alone device. Also provided are steps to initially configure the director for operation, verify and
monitor operation, replace switch field-replaceable units (FRUs), and install transceivers and cables.
Starting with this release, all new and modified content is listed in the
document.
Supported Hardware
The following tables list the orderable SKUs and the rack mount kits that are supported on this device. The first release of
this product was at Fabric OS
Table 1: Supported FRUs
SKU
XBR-X6-
AC Power Supply
RACNPIPSU-0104
XBR-X6-
RACNPEPSU-0104
HVAC/HVDC Power
XBR-X6-
HVNPIPSU-0104
Supply
XBR-X6-
HVNPEPSU-0104
XBR-X6-
Fan Assembly
FANNPI-0122
XBR-X6-
FANNPE-0122
Broadcom
®
9.0.0.
Part Number
Provides 1450W (100–120 VAC) and
2870W (200–240 VAC). This model
supports nonport-side intake (NPI) airflow.
Provides 1450W (100–120 VAC) and
2870W (200–277 VAC). This model
supports nonport-side exhaust (NPE)
airflow.
Dual-function high-voltage model provides
the following power output from either
high-voltage AC or DC power source:
•
1450W (100–120 VAC)
•
2870W (200–277 VAC)
•
2870W (240–380 VDC)
This model supports nonport-side intake
(NPI) airflow.
Dual-function high-voltage model provides
the following power output from either
high-voltage AC or DC power source:
•
1450W (100–120 VAC)
•
2870W (200–277 VAC)
•
2870W (240–380 VDC)
This model supports nonport-side exhaust
(NPE) airflow.
Supports NPI airflow
Supports NPE airflow
Revision History
Short Description
®
Brocade
X7-8 Director Hardware Installation Guide
section at the end of this
Introduced (OS)
Currently Supported
Fabric OS 9.0.0
Yes
Fabric OS 9.0.0
Yes
Fabric OS 9.0.0
Yes
Fabric OS 9.0.0
Yes
Fabric OS 9.0.0
Yes
Fabric OS 9.0.0
Yes
X7-8-Install-IG100
9