Relocation Of The Machine - Trotec Speedy 360 fiber Operating Manual

Table of Contents

Advertisement

5.8

Relocation of the machine

Steps:
1. Switch off the machine.
2. Disconnect the power cable.
3. Remove the exhaust system.
4. Reposition the machine (e.g. with auxiliary equipment if necessary) and place it on a level, clean floor.
5. Adjust the machine.
6. Initial commissioning of the electrical system.
7. Carry out function test.
Caution
Transport the machine only in its original packaging. Ensure the wooden crates are properly
secured otherwise the crates can slip, tip or fall over during transport.
Observe the corresponding safety norms and regulations from the chapters "Safety notes" and
"Transport".
When transporting over long distances, use transport boxes including transport securing.
Notice
If you would like to relocate the machine, contact our experienced Technical Support in your
local area.
ENGLISH (Translation)
Transport
51

Advertisement

Table of Contents
loading

Table of Contents