Daikin 2MXS18GVJU Service Manual page 7

Removal procedure, 7.1/8.0 kw class, 18000 btu/h class, outdoor unit, inverter, multi type, heat pump
Hide thumbs Also See for 2MXS18GVJU:
Table of Contents

Advertisement

Si12-994
Step
5
Remove the reactor
lead wires.
3. Remove the wire fixing
plate.
1
Remove the 2 screws
of the wire fixing plate.
4. Remove the electrical
box.
1
Remove the screw of
the electrical box.
Remove the screw of
2
the electrical box.
Removal Procedure
Procedure
Reactor
Removal of Electrical Box (Pattern 1)
(R2170)
Wire fixing
plate
(R11309)
(R2172)
(R2173)
Points
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

3mxs80ev2cPmxs3gv2c

Table of Contents