Daikin 2MXS18GVJU Service Manual page 10

Removal procedure, 7.1/8.0 kw class, 18000 btu/h class, outdoor unit, inverter, multi type, heat pump
Hide thumbs Also See for 2MXS18GVJU:
Table of Contents

Advertisement

Removal of Electrical Box (Pattern 2)
Step
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the
connectors for the
thermistors [S90] [S92]
[S93] and the overload
protector [S40].
8
Procedure
[S90] [S92] [S93]
[S40]
[S80]
(R17398)
[S40]: overload protector
[S90]: thermistors
[S92]: gas pipe thermistors
[S93]: liquid pipe thermistors
(R17399)
Thermistor
ASSY
Si12-994
Points
When reassembling, insert
the clamp into the hole as
below.
Clamp
(R17397)
(outdoor temperature,
outdoor heat exchanger,
discharge pipe)
Pull out the clamp.
When reassembling, insert
each clamp of the
thermistors into one of the
holes as below.
[S93]
(R17401)
[S92]
When reassembling, insert
each clamp into the holes.
When reassembling, the
thermistor harness should
be placed between the
electrical box and the reactor
harness as below.
Reactor harness
Reactor
harness
Thermistor
ASSY
(R17093)
Removal Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

3mxs80ev2cPmxs3gv2c

Table of Contents