Download Print this page

Advertisement

Quick Links

INSTRUCTIONS
360 Y-DROP
®
JOHN DEERE 4630
360 Y-DROP
REGISTRATION
®
Please visit
productregistration.360yieldcenter.com
to complete the product registration for your
360 Y-DROP so we can better support our products
from day one and ensure you have the latest
upgrades, warranty parts and technical support.
Thank you!
360YIELDCENTER.COM
V1 - 12.22.2016

Advertisement

loading

Summary of Contents for 360 Yield 360 Y-DROP JOHN DEERE 4630

  • Page 1 INSTRUCTIONS 360 Y-DROP ® JOHN DEERE 4630 360 Y-DROP REGISTRATION ® Please visit productregistration.360yieldcenter.com to complete the product registration for your 360 Y-DROP so we can better support our products from day one and ensure you have the latest upgrades, warranty parts and technical support. Thank you! 360YIELDCENTER.COM V1 - 12.22.2016...
  • Page 2: Recommended Tools

    INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INTRODUCTION Before beginning, it’s important to know where each mounting bracket fits relative to the row spacing involved. The 360 Y-DROP unit should be precisely centered on the machine, as this is critical to the assembly of the system to the sprayer and for mounting the system to your sprayer boom.
  • Page 3 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 ESTABLISH DROP LOCATIONS Figures 1 and 2 Step 1 Locate the center of the machine and identify the location of all the drops. On the sprayer boom, mark where each riser mount will be located. This will ensure that the extension tubes will not interfere Figure 1 with the riser mounts.
  • Page 4 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INSTALL PRIMARY BOOM SPRAYER MOUNT PACKAGE Figure 4 Step 1 With the thread pointing down, install square U-bolt (1) on the top of the OEM primary boom. Bag AG Step 2 Install bracket assembly (2) and flange Figure 4 lock nut (3).
  • Page 5 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INSTALL CENTER SECTION III. EXTENSION TUBE Figures 6 and 7 Step 1 Install 14" top plate (1) and 8" top plate (2) using the supplied hardware. Step 2 Install bracket assemblies (3). Step 3 Install extension tube (4).
  • Page 6 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INSTALL 360 Y-DROP BOOM Figure 8 Step 1 Assemble 5' boom sections (1) utilizing 8" boom connectors (2) and the supplied hardware. Hardware Bag CC Step 2 Repeat Step 1 as needed in order to Figure 8 assemble the entire 360 Y-DROP boom.
  • Page 7 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INSTALL BREAKAWAY ASSEMBLY - ONE PIECE Figure 12 Step 1 Install breakaway assembly - one piece (1) using the square U-bolts (2) and the extra thick washer and Nylock nut. Repeat for the remaining breakaway assemblies - one piece.
  • Page 8 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INSTALL RISER MOUNTS WITHOUT BREAKAWAY ASSEMBLIES (OPTIONAL) Figure 15 Step 1 Install riser mount (1) using the square U-bolts (2) and the extra thick washer and nylock nut. Repeat for the remaining riser mounts. Hardware Kit C Figure 15 Figure 16...
  • Page 9 INSTRUCTIONS 360 Y-DROP JOHN DEERE 4630 INSTALL SHIELDS AND RISER HOSES Figure 18 Step 1 Install shield (1) onto riser tube (2). Figure 19 Step 2 Install base unit (1) onto riser tube (2). Figure 20 Step 3 Assemble drag hoses (1) to 360 Y-DROP Figure 18 base and secure with hose clamps (2).
  • Page 10: Installation Complete

    Repeat Steps 1-11 for the remaining 360 Y-DROP Shields. Figure 24 INSTALLATION COMPLETE. 360YIELDCENTER.COM All other trademarks are the property of 360 Yield Center, its affiliates and/or its licensors. ©2016 360 Yield Center. All rights reserved.