INSTRUCTIONS 360 Y-DROP ® HAGIE ALUMINUM BOOM 360 Y-DROP REGISTRATION ® Please visit productregistration.360yieldcenter.com to complete the product registration for your 360 Y-DROP so we can better support our products from day one and ensure you have the latest upgrades, warranty parts and technical support. Thank you! 360YIELDCENTER.COM V1 - 12.01.2016...
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INTRODUCTION Before beginning, it’s important to know where each mounting bracket fits relative to the row spacing involved. The 360 Y-DROP unit should be precisely centered on the machine, as this is critical to the assembly of the system to the sprayer and for mounting the system to your sprayer boom.
Page 3
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM ESTABLISH DROP LOCATIONS Figures 1 and 2 Step 1 Locate the center of the machine and identify the location of all the drops. On the sprayer boom, mark where each riser mount will be located. This will ensure that the extension tubes will not interfere Figure 1 with the riser mounts.
Page 4
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL MOUNT ASSEMBLIES ON THE OEM PRIMARY BOOM Figure 4 Step 1 With the threads pointing down, install U-bolt (1) on the top of the OEM primary boom. Bag AB Step 2 Install bracket assembly (2) and flange Figure 4 lock nut (3).
Page 5
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL MOUNT ASSEMBLIES ON THE OEM PRIMARY BOOM (CONTINUED) Figure 6 WIDE MOUNT KIT If you are installing a system wider than 60ft, you will utilize the Hagie Wide Mount Kit (Part No. 417118). These parts are included if your system was ordered as a 70ft+ SMP.
Page 6
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL CENTER SECTION III. SQUARE TUBE Figure 7 Step 1 Place 8" top plate (1) on top of the center section and install two 7.5" bolts (2) with 3/8" washers and carriage bolts (3). Note the carriage bolt at the rear of the boom will need to be set in place on the 14"...
Page 7
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL YOKE ASSEMBLIES ON THE CENTER SECTION Figures 10 and 11 Step 1 With the U-bolt pointing down, install the yoke mount (1) and flange nuts to upper boom section. Step 2 With the square U-bolt threads pointing up and using the extra thick washer and Figure 10 Nylock nut, install yoke mount (2) to the...
Page 8
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL 360 Y-DROP BOOM Figure 12 Step 1 Assemble 5' boom sections (1) using the 8" boom connectors (2) and the supplied hardware. Hardware Bag CC Step 2 Repeat Step 1 as needed in order to Figure 12 assemble the entire 360 Y-DROP boom.
Page 9
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL BREAKAWAY ASSEMBLY - ONE PIECE Figure 16 Step 1 Install breakaway assembly - one piece (1) using the square U-bolts (2) and the extra thick washer and Nylock nut. Repeat for the remaining breakaway assemblies - one piece.
Page 10
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL RISER MOUNTS WITHOUT BREAKAWAY ASSEMBLIES (OPTIONAL) Figure 19 Step 1 Install riser mount (1) using the square U-bolts (2) and the extra thick washer and Nylock nut. Repeat for the remaining riser mounts. Hardware Kit C Figure 19 Figure 20...
Page 11
INSTRUCTIONS 360 Y-DROP HAGIE ALUMINUM BOOM INSTALL SHIELDS AND RISER HOSES Figure 22 Step 1 Install shield (1) onto riser tube (2). Figure 23 Step 2 Install base unit (1) onto riser tube (2). Figure 24 Step 3 Assemble drag hoses (1) to 360 Y-DROP Figure 22 base and secure with hose clamps (2).